WELL · 42-215-31323 · DISTRICT 4

Theser Gas Unit #2

Plugged

Hidalgo County · Hidalgo N. (7370) field  · Vertical

Theser Gas Unit #2 (API 42-215-31323) is a plugged well in Hidalgo County, plugged January 28, 1992, last operated by Miramar Petroleum Inc..

The RRC has issued 2 drilling permits (amended once) between 1983 and 1991, permitted to 8,500 ft.

Completion filings report 6 formation tops, including 6300' Frio, 6700' Frio, Card Sand, 7390' Frio.

Operator of record

Miramar Petroleum Inc.

Corpus Chrsti, TX · P-5 Y, filed May 5, 2017 · 99 permits on file · (361) 884-2927

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMiramar Petroleum Inc.
Production reportsnone
Latest permitMiramar Petroleum, Inc.Feb 19, 1991
8,500
total depth, ft
3
permits on file
Feb 19, 1991
last permit issued
Feb 18, 1991
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 18, 1991
Shut in
—
Plugged
Jan 28, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-4-106020——000—
— G-4-106021——000—
— G-4-137691——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
384867-98RecompletionMiramar Petroleum, Inc.Feb 25, 1991Feb 19, 1991Feb 12, 19918,466
384867-99RecompletionMiramar Petroleum, Inc.Feb 19, 1991Feb 19, 1991—8,466
190941-99DrillMiramar Petroleum, Inc.Mar 29, 1983Mar 29, 1983—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-106020————
—— G-4-106021————
—— G-4-137691————

Formation tops

As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →

FormationMD ftSubsea
6300' Frio6,325-6,226
6700' Frio6,718-6,619
Card Sand7,135-7,036
7390' Frio7,390-7,291
7435' Frio7,436-7,337
7730' Frio7,734-7,635

Perforations

Perforated and open-hole intervals.

FromToType
7,3887,394Perforated
7,4367,448Perforated
7,7377,749Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3757,640——
4.57,9118.751,275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 1991Feb 22, 1991Yes
00Apr 16, 1991——
00Jan 12, 1984Jun 13, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531323, documented in the API reference.