WELL · 42-215-31329 · DISTRICT 4
Johnson F. I. #13
Hidalgo County · Monte Christo (5950) field · Vertical
Johnson F. I. #13 (API 42-215-31329) is a plugged well in Hidalgo County, plugged March 10, 2010, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 3 drilling permits between 1983 and 1987, permitted to 7,500 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
Spring, TX · P-5 Y, filed May 4, 2026 · 6,763 permits on file · (281) 773-7706
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Nov 17, 1987 |
- 7,500
- total depth, ft
- 3
- permits on file
- Nov 17, 1987
- last permit issued
- Jan 5, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 5, 1988
- Shut in
- —
- Plugged
- Mar 10, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson, F. I. O-4-10148 | Monte Christo (5950) | Mobil Producing TX. & N.M. Inc. | 9 | 0 | 0 | Jan 1993 – Mar 2010 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 338862-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Nov 16, 1987 | Nov 17, 1987 | — | 6,800 |
| 330647-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 22, 1987 | May 28, 1987 | — | 6,800 |
| 191393-99 | Drill | Superior Oil Company, The | Mar 23, 1983 | Mar 23, 1983 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-10148 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,030 | 2,186 | Perforated |
| 6,372 | 6,378 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,317 | 12.25 | 315 S |
| 9.625 | 1,317 | — | — |
| 2.875 | 5,703 | — | — |
| 7 | 6,800 | 8.75 | 560 S |
| 7 | 6,800 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 1988 | Jan 15, 1988 | — |
| 00 | Jul 24, 1987 | Jun 25, 1987 | Yes |
| 00 | Jan 12, 1984 | Apr 28, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31329 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31329 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 2.79K
- bbl, last 12 reported months
- 2.48M
- bbl, all reported
- Jun 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000064766 | W-14 Disposal | Plugged Mar 19, 2010 | 2,000 | 1,000 | 2,030–2,186 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 2,787 · prior 12 8,872(-69%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531329, documented in the API reference.