WELL · 42-215-31344 · DISTRICT 4
Johnson, Mary #2
Hidalgo County · Vertical
Johnson, Mary #2 (API 42-215-31344) is a permitted well in Hidalgo County filed by Williams, Clayton W., JR.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1983 and 1986, permitted to 17,500 ft.
Completion filings report 5 formation tops, including Monte Christo F-25, Monte Christo F-27, Monte Christo 43, Vicksburg.
Operator of record
Midland, TX · P-5 Y, filed Sep 1, 1992 · 589 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Galilee Oil Investments LLCthrough Apr 2023 |
| Latest permit | Williams, Clayton W., Jr.Aug 22, 1986 |
- 17,500
- total depth, ft
- 3
- permits on file
- Aug 22, 1986
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 142K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson, Mary G-4-110751 | Monte Christo (VX-Eckart-EE CNS) | Cal-Tex Exploratn & Prod Co LLC | 1 | 0 | 142K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Williams, Clayton W., Jr., Inc.Jan 1993 → Apr 1993
- 2Williams, Clayton Energy, L.L.CMay 1993 → May 1993
- 3Williams, Clayton Energy, Inc.Jun 1993 → Jul 2014
- 4Timberwolf E&P LLCDec 2015 → Dec 2015
- 5Galilee Oil Investments LLCOct 2017 → Apr 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 305702-99 | Recompletion | Williams, Clayton W., Jr. | Aug 15, 1986 | Aug 22, 1986 | — | 9,430 |
| 251108-99 | Recompletion | Williams, Clayton W., Jr. | Aug 30, 1984 | Sep 10, 1984 | — | 9,430 |
| 196650-99 | Drill | Williams, Clayton W., Jr. | May 27, 1983 | May 27, 1983 | Jan 23, 1984 | 17,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-110751 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 219 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Monte Christo F-25 | 6,250 | -6,031 |
| Monte Christo F-27 | 6,360 | -6,141 |
| Monte Christo 43 | 7,535 | -7,316 |
| VicksburgVICKSBURG-ECKHART | 9,630 | -9,411 |
| Monte Christo 40 | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,634 | 10,019 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,810 | 14.75 | 1,070 sx |
| 7 | 8,989 | 9.875 | 1,250 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 1984 | May 29, 1984 | — |
| 00 | Jun 7, 1984 | May 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31344 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31344 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531344, documented in the API reference.