WELL · 42-215-31374 · DISTRICT 4

Wolcott #1

Plugged

Hidalgo County · Whitted N. (8046 Sd.) field  · Vertical

Wolcott #1 (API 42-215-31374) is a plugged well in Hidalgo County, plugged December 29, 1987, last operated by Denovo Oil & Gas Inc..

The RRC has issued one drilling permit, issued September 2, 1983, permitted to 8,200 ft.

It was permitted by Goldking Prod. CO. and has since transferred to Denovo Oil & Gas Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Harding, Firstenberg, Vicksburg.

Operator of record

Denovo Oil & Gas Inc.

Permitted by Goldking Prod. Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jun 7, 1996 · 43 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDenovo Oil & Gas Inc.
Production reportsnone
Latest permitGoldking Prod. Co.Sep 2, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,200
total depth, ft
1
permits on file
Sep 2, 1983
last permit issued
Oct 7, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 7, 1983
Shut in
—
Plugged
Dec 29, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
209954-99DrillGoldking Prod. Co.Sep 12, 1983Sep 2, 1983—8,200

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Harding5,892
Firstenberg6,771
Vicksburg7,329

Perforations

Perforated and open-hole intervals.

FromToType
8,0468,065Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,10213.5955 S
5.58,4559.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 1984Dec 30, 1983—
00Feb 6, 1984Dec 30, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531374, documented in the API reference.