WELL · 42-215-31696 · DISTRICT 4

Cook V. #2

N

Hidalgo County · Monte Christo (59) field  · Vertical

Cook V. #2 (API 42-215-31696) is a well in Hidalgo County operated by Tana Oil & Gas Corporation, completed August 20, 1987.

The RRC has issued 4 drilling permits between 1986 and 2006, permitted to 11,000 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Tana Oil & Gas Corporation on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Tana Oil & Gas Corporation

Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Irving, TX · P-5 Y, filed Sep 15, 1989 · 229 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTana Oil & Gas Corporation
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEL Paso Production Oil & Gas Co.Jun 1, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
4
permits on file
Jun 1, 2006
last permit issued
Aug 20, 1987
completed
0
cumulative oil, bbl
768K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 20, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
V. Cook et al Gas Unit 2-A G-4-126236Monte Christo (56-a, N)Merit Energy Company10429KJan 1993 – Jul 2026
V. Cook et al Gas Unit A-1 G-4-221867Monte Christo (58,59 Cons.)Merit Energy Company10339KJul 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 5,382 · prior 12 4,363(+23%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Mar 2000
  2. 2Coastal Oil & Gas CorporationApr 2000 → Jun 2001
  3. 3EL Paso Production Oil & Gas Co.Jul 2001 → May 2006
  4. 4EL Paso E & P Company, L. P.Jul 2006 → Jul 2012
  5. 5EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  6. 6Cantera Operating, LLCNov 2013 → Nov 2017
  7. 7Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619418-99RecompletionEL Paso Production Oil & Gas Co.May 17, 2006Jun 1, 2006Jun 6, 20069,996
338586-99RecompletionTana Oil & Gas Corp.Nov 9, 1987Dec 14, 1987—9,996
333269-99RecompletionTana Oil & Gas Corp.Jul 22, 1987Jul 24, 1987—9,996
301363-99DrillTana Oil & Gas Corp.Apr 22, 1986Apr 23, 1986May 11, 198611,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-126236————
—— G-4-221867————

Perforations

Perforated and open-hole intervals.

FromToType
8,4288,606Perforated
9,3249,393Perforated
9,3369,393Perforated
9,4749,751Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,98714.751,010 S
7.6258,9749.875715 S
4.59,9816.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 2, 2007Oct 25, 2006—
00Mar 28, 2007Aug 22, 2006Yes
00Nov 21, 2006——
00Jul 19, 1990May 18, 1990Yes
00Feb 19, 1988Jan 15, 1988Yes
00Feb 9, 1988——
00Oct 29, 1987Sep 1, 1987Yes
00Sep 17, 1987——
00Aug 7, 1986Jul 16, 1986Yes
00Aug 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531696, documented in the API reference.