WELL · 42-215-31921 · DISTRICT 4

Cook V. et al G.U. 1-A #5

N

Hidalgo County · Monte Christo (58 59 Cons.) field  · Vertical

Cook V. ET AL G.U. 1-A #5 (API 42-215-31921) is a well in Hidalgo County operated by El Paso E & P Company L. P., completed February 25, 1991.

The RRC has issued 2 drilling permits between 1990 and 2006, permitted to 12,000 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to El Paso E & P Company L. P. on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

EL Paso E & P Company L. P.

Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 6, 2015 · 582 permits on file · (713) 420-2600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso E & P Company L. P.
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEL Paso Production Oil & Gas Co.Mar 20, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Mar 20, 2006
last permit issued
Feb 25, 1991
completed
0
cumulative oil, bbl
146K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 1991
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vannie Cook G-4-219270Monte Christo (56-a, N)Merit Energy Company10115KApr 2006 – Jul 2026
Cook, V. et al G.U. 1-A G-4-135373Monte Christo (58,59 Cons.)EL Paso E & P Company, L. P.1031.7KJan 1993 – Jan 2010

Gas, mcf lease total

Last 12 months 486 · prior 12 37(+1214%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Mar 2000
  2. 2Coastal Oil & Gas CorporationApr 2000 → Jan 2001
  3. 3EL Paso Production Oil & Gas Co.Nov 2001 → Apr 2006
  4. 4EL Paso E & P Company, L. P.Apr 2006 → Jul 2012
  5. 5EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  6. 6Cantera Operating, LLCNov 2013 → Nov 2017
  7. 7Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
615843-99RecompletionEL Paso Production Oil & Gas Co.Mar 14, 2006Mar 20, 2006Apr 7, 20069,585
370116-99DrillTexaco TPC Inc.Feb 21, 1990Feb 22, 1990—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-135373————
—— G-4-219270————

Perforations

Perforated and open-hole intervals.

FromToType
8,5768,602Perforated
8,7148,718Perforated
9,0289,072Perforated
9,4909,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,00814.751,400 S
7.6258,9709.8751,555 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 2, 2007May 11, 2006Yes
00Sep 22, 2006——
00Jan 4, 1994Nov 8, 1993—
00Apr 29, 1991Nov 2, 1990—
00Dec 10, 1990Aug 10, 1990Yes
00Aug 16, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531921, documented in the API reference.