WELL · 42-215-32004 · DISTRICT 4

Guerra A. E. #22R

N

Hidalgo County · McAllen Ranch(vicksburg-U-V- SE) field  · Vertical

Guerra A. E. #22R (API 42-215-32004) is a well in Hidalgo County operated by Texaco E & P Inc., completed April 25, 1991.

The RRC has issued 3 drilling permits between 1990 and 2011, permitted to 17,000 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Frio, Vicksburg.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 12.4K barrels injected in the 12 months reported through January 2026.

Operator of record

Texaco E & P Inc.

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 3,332 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reportsTexaco E & P Inc.through Jan 2001
Latest permitChevron U. S. A. Inc.Sep 28, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
3
permits on file
Sep 28, 2011
last permit issued
Apr 25, 1991
completed
0
cumulative oil, bbl
4.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 25, 1991
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guerra, A. E. G-4-266295Santellana (6500)Hilcorp Energy Company100Aug 2011 – Jul 2026
Guerra, A. E. O-4-13003WildcatHilcorp Energy Company300Dec 2000 – Jul 2026
Guerra, A. E. G-4-138078McAllen Ranch(vicksburg-U-V-,se)Texaco E & P Inc.104.41MJan 1993 – Jul 2001
Guerra, A. E. G-4-182502WildcatTexaco E & P Inc.100Jan 2001 – Jan 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Jan 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
724592-99RecompletionChevron U. S. A. Inc.Sep 20, 2011Sep 28, 2011Aug 14, 201112,665
503872-99RecompletionTexaco E & P Inc.Jan 10, 2001Jan 10, 2001Jan 17, 200114,000
381875-99DrillTexaco Producing Inc.Dec 4, 1990Dec 11, 1990Jan 28, 199117,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-138078————
—— G-4-182502————
—— G-4-266295————
—— O-4-13003————

Formation tops

As filed on W-2/G-1. Subsea from 122 ft elevation.Download CSV →

FormationMD ftSubsea
Frio6,150-6,028
Vicksburg7,200-7,078

Perforations

Perforated and open-hole intervals.

FromToType
6,6506,670Perforated
6,6706,700Perforated
6,7006,730Perforated
6,7306,760Perforated
6,7606,790Perforated
6,7906,820Perforated
6,8206,850Perforated
8,8688,878Perforated
8,8818,891Perforated
12,05412,320Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,02017.51,800 S
9.6258,90812.251,865 S
5.511,3266.5690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2013Oct 11, 2011—
00Aug 8, 2001May 11, 2001—
00Jun 27, 2001——
00May 31, 2001——
00Jul 19, 1991May 9, 1991Yes
00May 14, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

12.4K
bbl, last 12 reported months
1.92M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099719W-14 DisposalActive4,0003,3006,600–7,250

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 12,354 · prior 12 0

02K4K6K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532004, documented in the API reference.