WELL · 42-215-32119 · DISTRICT 4
Hamman Ranch #32
Hidalgo County · Vertical
Hamman Ranch #32 (API 42-215-32119) is a permitted well in Hidalgo County filed by Rms Monte Christo, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended twice) between 1993 and 1996, permitted to 12,500 ft.
Completion filings report 4 formation tops, including Frio, Vicksburg, Vx Aa, Vx Ee.
Operator of record
Snowmass Vlg., CO · P-5 Y, filed May 11, 2001 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | EL Paso E & P Company, L. P.through Nov 2009 |
| Latest permit | RMS Monte Christo, LLCNov 4, 1996 |
- 12,500
- total depth, ft
- 4
- permits on file
- Nov 4, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.94M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hamman Ranch G-4-148838 | Monte Christo (VX-Eckart-EE CNS) | Merit Energy Company | 1 | 0 | 1.94M | Mar 1994 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Mar 1994 → May 1996
- 2RMS Monte Christo, LLCJun 1996 → Oct 1997
- 3Anr Production CompanyNov 1997 → Nov 1997
- 4Coastal Oil & Gas CorporationDec 1997 → Jun 2001
- 5EL Paso Production Oil & Gas Co.Jul 2001 → Jul 2006
- 6EL Paso E & P Company, L. P.Aug 2006 → Nov 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 454761-99 | Recompletion | RMS Monte Christo, LLC | Nov 4, 1996 | Nov 4, 1996 | — | 11,780 |
| 410611-97 | Drill | Shell Western E&P Inc. | Feb 1, 1994 | Apr 9, 1993 | Dec 19, 1993 | 12,500 |
| 410611-98 | Drill | Shell Western E&P Inc. | Dec 14, 1993 | Apr 9, 1993 | — | 12,500 |
| 410611-99 | Drill | Shell Western E&P Inc. | Apr 9, 1993 | Apr 9, 1993 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-148838 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,062 | 9,102 | Perforated |
| 9,258 | 9,282 | Perforated |
| 9,333 | 9,361 | Perforated |
| 9,420 | 9,430 | Perforated |
| 9,420 | 9,450 | Perforated |
| 9,430 | 9,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,066 | 14.75 | 1,789 S |
| 7 | 9,888 | 9.875 | 2,330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 9, 2005 | Jul 1, 2005 | — |
| 00 | Mar 3, 1995 | Jan 27, 1995 | — |
| 00 | Jun 9, 1994 | Apr 1, 1994 | — |
| 00 | Apr 28, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-32119 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-32119 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21532119, documented in the API reference.