WELL · 42-215-32177 · DISTRICT 4

Keirn, Pearl #5

N

Hidalgo County  · Directional

Keirn, Pearl #5 (API 42-215-32177) is a permitted well in Hidalgo County filed by Totalfinaelf E&P USA Inc; no completion report is on file yet.

The RRC has issued 2 drilling permits (amended twice) between 1994 and 2003, permitted to 11,500 ft.

Completion filings report 4 formation tops, including Graham, Graham 8500, Hansen, Marks.

Operator of record

Totalfinaelf E&P USA Inc

Houston, TX · P-5 Y, filed Oct 10, 2003 · 138 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTotalfinaelf E&P USA Incthrough Mar 2003
Latest permitTotalfinaelf E&P USA IncFeb 11, 2003
11,500
total depth, ft
4
permits on file
Feb 11, 2003
last permit issued
—
completed
0
cumulative oil, bbl
1.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keirn, Pearl G-4-156694McAllen (Keirn)Merit Energy Company101.64MJan 1995 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1995 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Mar 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
528360-99RecompletionTotalfinaelf E&P USA IncFeb 11, 2003Feb 11, 2003—10,625
425587-97DrillFina Oil & Chemical CompanyDec 27, 1995Jul 15, 1994Sep 3, 199410,635
425587-98DrillFina Oil & Chemical CompanyAug 22, 1994Jul 15, 1994—11,500
425587-99DrillFina Oil & Chemical CompanyJul 5, 1994Jul 15, 1994—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-156694————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Graham7,975
Graham 85007,975
Hansen8,563
Marks9,338

Perforations

Perforated and open-hole intervals.

FromToType
9,4929,604Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,15217.5700 S
10.752,11512.25400 S
7.6258,1069.875670 S
510,6236.75230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 3, 1996Jul 31, 1995—
00Mar 26, 1996Jul 31, 1995Yes
00Jan 29, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532177, documented in the API reference.