WELL · 42-215-32342 · DISTRICT 4
Pharr Fieldwide Unit #27
Hidalgo County · Vertical
Pharr Fieldwide Unit #27 (API 42-215-32342) is a permitted well in Hidalgo County filed by Shell Western E&P; no completion report is on file yet.
The RRC has issued 5 drilling permits between 1996 and 2010, permitted to 13,500 ft.
Completion filings report 11 formation tops, including 6100 Sand, 6100' Sand, Arizona - Texas Sand, Arizona-Texas Sand.
Operator of record
Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Merit Energy Companythrough Apr 2026 |
| Latest permit | Shell Western E&PNov 16, 2010 |
- 13,500
- total depth, ft
- 5
- permits on file
- Nov 16, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 11.2M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pharr Fieldwide Unit G-4-267005 | McAllen-Pharr (Consolidated) | Merit Energy Company | 1 | 0 | 519K | Jan 2012 – Jul 2026 |
| Pharr Fieldwide Unit G-4-240378 | Pharr (Marks) | OXY USA Inc. | 1 | 0 | 1.11M | Mar 2008 – Feb 2012 |
| Pharr Fieldwide Unit G-4-169612 | Pharr (Reichert) | Shell Western E&P | 1 | 0 | 5.99M | May 1998 – Mar 2008 |
| Pharr Fieldwide Unit G-4-164196 | Pharr (Hensley) | Fina Oil & Chemical Company | 1 | 0 | 3.62M | Dec 1996 – May 1998 |
Gas, mcf lease total
Last 12 months 18,771 · prior 12 20,539(-9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyDec 1996 → Dec 2000
- 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
- 3Total E&P USA, Inc.Sep 2003 → Jun 2005
- 4Shell Western E&PMar 2008 → Apr 2011
- 5OXY USA Inc.May 2011 → Apr 2017
- 6Merit Energy CompanyMay 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705234-99 | Recompletion | Shell Western E&P | Nov 11, 2010 | Nov 16, 2010 | Dec 9, 2011 | 12,290 |
| 654817-99 | Recompletion | Shell Western E&P | Feb 7, 2008 | Feb 15, 2008 | Feb 28, 2008 | 12,290 |
| 498895-99 | Recompletion | Fina Oil & Chemical Company | Aug 25, 2000 | Aug 28, 2000 | — | 12,290 |
| 478941-99 | Recompletion | Fina Oil & Chemical Company | Aug 24, 1998 | Aug 25, 1998 | May 2, 1998 | 12,290 |
| 452298-99 | Drill | Fina Oil & Chemical Company | Sep 5, 1996 | Sep 9, 1996 | Sep 19, 1996 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-164196 | — | — | — | — |
| — | — G-4-169612 | — | — | — | — |
| — | — G-4-240378 | — | — | — | — |
| — | — G-4-267005 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 110 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 6100 Sand | 6,460 | -6,350 |
| 6100' Sand | 6,460 | -6,350 |
| Arizona - Texas Sand | 7,855 | -7,745 |
| Arizona-Texas Sand | 7,855 | -7,745 |
| 8500 Sand | 8,610 | -8,500 |
| 8500' Sand | 8,610 | -8,500 |
| Bond | 8,610 | -8,500 |
| 8500 | 9,700 | -9,590 |
| Marks Sand | 9,700 | -9,590 |
| Bond Sand | 10,206 | -10,096 |
| Marks | 10,206 | -10,096 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,475 | 9,490 | Perforated |
| 9,815 | 9,835 | Perforated |
| 11,710 | 11,761 | Perforated |
| 11,768 | 11,778 | Perforated |
| 12,367 | 12,591 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,525 | 17.5 | 1,436 S |
| 9.625 | 8,956 | 12.25 | 1,320 S |
| 9.625 | 9,050 | 12.25 | 1,320 S |
| 3.5 | 10,577 | 6.625 | 237 S |
| 7.625 | 11,205 | 8.5 | 500 S |
| 5 | 13,140 | 6.5 | 268 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 2013 | Mar 28, 2012 | — |
| 00 | Oct 16, 2008 | Jul 3, 2008 | Yes |
| 00 | Oct 11, 2008 | — | — |
| 00 | Oct 8, 1998 | Aug 25, 1998 | Yes |
| 00 | Sep 4, 1998 | — | — |
| 00 | Oct 6, 1997 | Mar 27, 1997 | Yes |
| 00 | Sep 11, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-32342 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-32342 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21532342, documented in the API reference.