WELL · 42-215-32413 · DISTRICT 4

Pharr Fieldwide Unit #32ST

N

Hidalgo County  · Directional · Sidetrack

Pharr Fieldwide Unit #32ST (API 42-215-32413) is a permitted well in Hidalgo County filed by Shell Western E&P; no completion report is on file yet.

The RRC has issued 6 drilling permits (amended twice) between 1997 and 2008, permitted to 16,000 ft.

Completion filings report 8 formation tops, including 6500 Sd., 8500 Sd., Hansen, Marks Sd..

Operator of record

Shell Western E&P

Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTotalfinaelf E&P USA Incthrough Apr 2002
Latest permitShell Western E&PApr 25, 2008
16,000
total depth, ft
8
permits on file
Apr 25, 2008
last permit issued
—
completed
0
cumulative oil, bbl
1.18M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pharr Fieldwide Unit G-4-189505Pharr (Hensley)Merit Energy Company1039.7KOct 2000 – Jul 2026
Pharr Fieldwide Unit G-4-168918Pharr (Reichert)Totalfinaelf E&P USA Inc10988KMar 1998 – May 2001
Pharr Fieldwide Unit G-4-168188Pharr (Hensley)Fina Oil & Chemical Company10150KNov 1997 – Feb 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyDec 1997 → Dec 2000
  2. 2Totalfinaelf E&P USA IncMay 2001 → Apr 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
655518-99RecompletionShell Western E&PFeb 18, 2008Apr 25, 2008—13,000
524191-99RecompletionTotalfinaelf E&P USA IncSep 30, 2002Oct 3, 2002—13,000
504037-99Recompletion · sidetrackTotalfinaelf E&P USA IncJan 12, 2001Jan 12, 2001Mar 20, 200116,000
499854-99RecompletionFina Oil & Chemical CompanySep 20, 2000Sep 25, 2000Aug 20, 200013,000
477148-99RecompletionFina Oil & Chemical CompanyJun 15, 1998Jul 9, 1998Jan 20, 199813,000
460845-97DrillFina Oil & Chemical CompanyMay 4, 1998Apr 9, 1997Aug 17, 199713,000
460845-98DrillFina Oil & Chemical CompanyJan 22, 1998Apr 9, 1997—13,000
460845-99DrillFina Oil & Chemical CompanyApr 8, 1997Apr 9, 1997—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-168188————
—— G-4-168918————
—— G-4-189505————

Formation tops

As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →

FormationMD ftSubsea
6500 Sd.6,810-6,788
8500 Sd.8,595-8,573
Hansen9,343-9,321
Marks Sd.9,760-9,738
Bond B Sd.10,450-10,428
Bond10,455-10,433
Reichert11,830-11,808
Hensley12,465-12,443

Perforations

Perforated and open-hole intervals.

FromToType
11,83211,876Perforated
12,36312,804Perforated
12,36612,640Perforated
12,51612,640Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,64617.51,380 S
9.6258,81012.251,380 S
7.62510,6858.5335 S
3.513,0006.5315 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 25, 2011Dec 16, 2010—
00May 12, 2005Jan 21, 2005—
00Oct 25, 2002Oct 23, 2000Yes
00Oct 17, 2002Apr 15, 2002Yes
00Jul 26, 2002——
00Oct 27, 1998Jun 16, 1998Yes
00Jul 23, 1998——
00Jun 22, 1998Jan 22, 1998Yes
00Jun 4, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532413, documented in the API reference.