WELL · 42-215-32638 · DISTRICT 4

Jeffress J. D. #4A

N

Hidalgo County · Jeffress (Vicksburg U) field  · Vertical

Jeffress J. D. #4A (API 42-215-32638) is a well in Hidalgo County operated by Cantera Operating LLC, completed May 21, 2005.

The RRC has issued 2 drilling permits between 1999 and 2014, permitted to 14,000 ft.

Completion filings report 10 formation tops, including Sullivan, Vicksburg, M, L.

No lease production has been reported under this well’s leases.

Operator of record

Cantera Operating LLC

The Woodlands, TX · P-5 Y, filed Sep 7, 2018 · 117 permits on file · (800) 871-1446

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCantera Operating LLC
Production reportsMerit Energy Companythrough Aug 2020
Latest permitCantera Operating, LLCAug 18, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Aug 18, 2014
last permit issued
May 21, 2005
completed
0
cumulative oil, bbl
445K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 21, 2005
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jeffress J.D. G-4-275280Jeffress (Vicksburg O)Merit Energy Company106.33KJul 2014 – Jul 2026
Jeffress, J. D. G-4-174051Jeffress (Vicksburg U)Cantera Operating, LLC10438KAug 1999 – Jul 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Greenbrier Oper. Co.Aug 1999 → Dec 1999
  2. 2Coastal Oil & Gas CorporationJan 2000 → May 2001
  3. 3EL Paso Production Oil & Gas Co.Nov 2002 → May 2006
  4. 4EL Paso E & P Company, L. P.Sep 2006 → Oct 2009
  5. 5Cantera Operating, LLCJul 2014 → Aug 2015
  6. 6Merit Energy CompanyDec 2017 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
791889-99RecompletionCantera Operating, LLCJul 17, 2014Aug 18, 2014Jul 11, 201412,772
483972-99DrillGreenbrier Oper. Co.Apr 20, 1999Apr 20, 1999May 3, 199914,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-174051————
—— G-4-275280————

Formation tops

As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →

FormationMD ftSubsea
Sullivan5,032-4,716
VicksburgVICKSBURG O7,366-7,050
M7,682-7,366
VicksburgVICKSBURG M7,682-7,366
L7,752-7,436
VicksburgVICKSBURG L7,752-7,436
S9,192-8,876
VicksburgVICKSBURG S9,192-8,876
T9,612-9,296
VicksburgVICKSBURG T9,612-9,296
U11,412-11,096
CatahoulaCATAHOULA-ANAHUAC - INJECTION/DI——
CatahoulaCATAHOULA-FRIO - INJECTION/DISPO——
Jackson——
Miocene (undifferentiated)MIOCENE-LAGARTO-OAKVILLE - INJEC——
VicksburgVICKSBURG - INJECTION/DISPOSAL;——

Perforations

Perforated and open-hole intervals.

FromToType
7,3667,400Perforated
7,6527,672Perforated
11,33611,389Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,50217.58,966 S
9.6256,70512.25403 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 6, 2015Sep 30, 2014—
00Oct 12, 2005Jun 1, 2005—
00Sep 16, 1999Sep 3, 1999Yes
00Sep 8, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532638, documented in the API reference.