WELL · 42-215-32805 · DISTRICT 4
McAllen Fieldwide Unit #72
Hidalgo County · McAllen (Marks) field · Directional
Mcallen Fieldwide Unit #72 (API 42-215-32805) is a plugged well in Hidalgo County, plugged March 21, 2003, last operated by Total E&P USA Inc..
The RRC has issued 2 drilling permits between 2000 and 2004, permitted to 13,000 ft.
Completion filings report 4 formation tops, including Hansen, Marks, Bond, Card.
Operator of record
Houston, TX · P-5 Y, filed Jun 2, 2017 · 74 permits on file · (281) 382-3534
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Total E&P USA Inc. |
| Production reports | Total E&P USA, Inc.through Feb 2003 |
| Latest permit | Total E&P USA, Inc.Jun 21, 2004 |
- 13,000
- total depth, ft
- 2
- permits on file
- Jun 21, 2004
- last permit issued
- Jun 6, 2002
- completed
- 0
- cumulative oil, bbl
- 592K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jan 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 2002
- Shut in
- —
- Plugged
- Mar 21, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McAllen Fieldwide Unit G-4-203221 | McAllen (Marks) | Total E&P USA, Inc. | 1 | 0 | 149K | May 2002 – Jan 2005 |
| McAllen Fieldwide Unit G-4-189112 | McAllen (Lower Marks) | Totalfinaelf E&P USA Inc | 1 | 0 | 443K | Jan 2001 – Mar 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Totalfinaelf E&P USA IncFeb 2001 → Jan 2003
- 2Total E&P USA, Inc.Aug 2002 → Feb 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 547226-99 | Recompletion | Total E&P USA, Inc. | Jun 21, 2004 | Jun 21, 2004 | — | 13,000 |
| 500039-99 | Drill | Fina Oil & Chemical Company | Sep 25, 2000 | Sep 26, 2000 | Oct 16, 2000 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-189112 | — | — | — | — |
| — | — G-4-203221 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 118 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hansen | 9,906 | -9,788 |
| Marks | 10,798 | -10,680 |
| Bond | 11,894 | -11,776 |
| Card | 77,081 | -76,963 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,800 | 10,816 | Perforated |
| 10,934 | 10,954 | Perforated |
| 11,391 | 11,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,525 | 17.5 | 1,121 S |
| 9.625 | 8,880 | 12.25 | 1,155 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 2005 | Aug 26, 2004 | Yes |
| 00 | Sep 9, 2004 | — | — |
| 00 | Jul 29, 2002 | Dec 19, 2001 | Yes |
| 00 | Jul 1, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-32805 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-32805 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.