WELL · 42-215-32895 · DISTRICT 4

Cook-Clemons GU #7

N

Hidalgo County · Monte Christo N. (Vicksburg T) field  · Vertical

Cook-Clemons GU #7 (API 42-215-32895) is a well in Hidalgo County operated by El Paso E & P Company L. P., completed August 20, 2001.

The RRC has issued 3 drilling permits between 2001 and 2008, permitted to 19,000 ft.

Completion filings report one formation top, including T Sd.

No lease production has been reported under this well’s leases.

Operator of record

EL Paso E & P Company L. P.

Houston, TX · P-5 Y, filed Feb 6, 2015 · 582 permits on file · (713) 420-2600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso E & P Company L. P.
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEL Paso E & P Company, L. P.Mar 6, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

19,000
total depth, ft
3
permits on file
Mar 6, 2008
last permit issued
Aug 20, 2001
completed
0
cumulative oil, bbl
3.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 20, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cook-Clemons Gas Unit G-4-232652Monte Christo (VX-Eckart-EE CNS)Merit Energy Company10171KSep 2007 – Jul 2026
Cook-Clemons Gas Unit G-4-257083Monte Christo (58,59 Cons.)Merit Energy Company10555KMar 2008 – Jul 2026
Cook-Clemons GU G-4-187054Monte Christo, N. (Vicksburg T)EL Paso E & P Company, L. P.102.68MAug 2001 – May 2008

Gas, mcf lease total

Last 12 months 14,343 · prior 12 8,883(+61%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso Production Oil & Gas Co.Sep 2001 → Jul 2006
  2. 2EL Paso E & P Company, L. P.Aug 2006 → Jul 2012
  3. 3EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  4. 4Cantera Operating, LLCNov 2013 → Nov 2017
  5. 5Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
656197-99RecompletionEL Paso E & P Company, L. P.Feb 27, 2008Mar 6, 2008Feb 27, 200813,800
645478-99RecompletionEL Paso E & P Company, L. P.Sep 4, 2007Sep 6, 2007Aug 11, 200713,800
509009-99DrillCoastal Oil & Gas CorporationMay 15, 2001May 15, 2001Jun 17, 200119,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-187054————
—— G-4-232652————
—— G-4-257083————

Formation tops

As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →

FormationMD ftSubsea
T SD14,860-14,652

Perforations

Perforated and open-hole intervals.

FromToType
8,9188,960Perforated
9,0159,106Perforated
9,3459,396Perforated
9,5389,732Perforated
14,86015,052Perforated
15,27015,314Perforated
15,48915,850Perforated
16,15716,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,00017.52,345 S
9.6259,79212.251,335 S
517,1488.51,645 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 21, 2010Mar 21, 2008Yes
00Sep 1, 2010——
00Jul 1, 2008Nov 14, 2007Yes
00Jan 31, 2008——
00Mar 19, 2002Feb 11, 2002Yes
00Feb 27, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532895, documented in the API reference.