WELL · 42-215-32902 · DISTRICT 4

Pharr Fieldwide Unit #42

N

Hidalgo County  · Vertical

Pharr Fieldwide Unit #42 (API 42-215-32902) is a permitted well in Hidalgo County filed by Shell Western E&P; no completion report is on file yet.

The RRC has issued 4 drilling permits (amended once) between 2001 and 2009, permitted to 14,000 ft.

Completion filings report 12 formation tops, including 8500, 8500 Sand, 8500' Sand, Hanson.

Operator of record

Shell Western E&P

Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMerit Energy Companythrough Apr 2026
Latest permitShell Western E&PDec 2, 2009
14,000
total depth, ft
5
permits on file
Dec 2, 2009
last permit issued
—
completed
0
cumulative oil, bbl
2.8M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pharr Fieldwide Unit G-4-248850McAllen-Pharr (Consolidated)Merit Energy Company102.12MApr 2009 – Jul 2026
Pharr Field Wide Unit G-4-189386Pharr (Hensley)Shell Western E&P10687KJan 2002 – Mar 2009

Gas, mcf lease total

Last 12 months 15,199 · prior 12 2(+759850%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Totalfinaelf E&P USA IncJan 2002 → Aug 2003
  2. 2Total E&P USA, Inc.Sep 2003 → Jan 2004
  3. 3Shell Western E&PApr 2009 → Apr 2011
  4. 4OXY USA Inc.May 2011 → Apr 2017
  5. 5Merit Energy CompanyMay 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
685439-99RecompletionShell Western E&PSep 23, 2009Dec 2, 2009—14,000
640510-99RecompletionShell Western E&PJun 11, 2007Jun 20, 2007Aug 29, 200814,000
531163-99RecompletionTotalfinaelf E&P USA IncApr 25, 2003Apr 25, 2003—12,741
509623-98DrillTotalfinaelf E&P USA IncAug 16, 2001May 30, 2001Aug 25, 200114,000
509623-99DrillTotalfinaelf E&P USA IncMay 30, 2001May 30, 2001—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-189386————
—— G-4-248850————

Formation tops

As filed on W-2/G-1. Subsea from 109 ft elevation.Download CSV →

FormationMD ftSubsea
85008,502-8,393
8500 Sand8,502-8,393
8500' Sand8,502-8,393
Hanson9,252-9,143
Hanson Sand9,252-9,143
Marks9,718-9,609
Marks Sand9,718-9,609
Marks' Sand9,718-9,609
Bond10,189-10,080
Bond Sand10,189-10,080
Reichert11,825-11,716
Hensley12,200-12,091

Perforations

Perforated and open-hole intervals.

FromToType
8,5498,563Perforated
9,7709,775Perforated
12,20012,591Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,48717.51,880 S
13.3752,52417.51,880 S
9.6258,68512.25650 S
9.6258,76412.25650 S
3.510,3014.25450 S
512,7416.5562 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 2019Jun 18, 2019—
00Oct 28, 2009May 13, 2009Yes
00Jul 3, 2009——
00Aug 8, 2002Jun 6, 2002Yes
00Jul 16, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532902, documented in the API reference.