WELL · 42-215-33043 · DISTRICT 4

McAllen Fieldwide Unit #84ST

N

Hidalgo County · McAllen (Graham 8500 FB D) field  · Directional · Sidetrack

Mcallen Fieldwide Unit #84ST (API 42-215-33043) is a well in Hidalgo County operated by Shell Western E&P, completed November 20, 2003.

The RRC has issued 2 drilling permits (amended twice) between 2002 and 2007, permitted to 12,500 ft.

Completion filings report 11 formation tops, including 6500' Sand, 6700' Sand, 6500 Sand, 6900 Sand.

No lease production has been reported under this well’s leases.

Operator of record

Shell Western E&P

Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShell Western E&P
Production reportsMerit Energy Companythrough Oct 2021
Latest permitShell Western E&PNov 14, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
4
permits on file
Nov 14, 2007
last permit issued
Nov 20, 2003
completed
0
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 20, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen Fieldwide Unit G-4-235324McAllen-Pharr (Consolidated)Merit Energy Company101.33MFeb 2008 – Jul 2026
McAllen Fieldwide Unit G-4-201906McAllen (Graham 8500 FB D)Shell Western E&P1028.1KNov 2003 – Feb 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Total E&P USA, Inc.Nov 2003 → Jul 2004
  2. 2Shell Western E&PJun 2006 → Apr 2011
  3. 3OXY USA Inc.May 2011 → Apr 2017
  4. 4Merit Energy CompanyMay 2017 → Oct 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
648768-99RecompletionShell Western E&POct 31, 2007Nov 14, 2007Dec 5, 200710,900
525817-97Drill · sidetrackTotal E&P USA, Inc.May 13, 2004Nov 22, 2002Jul 29, 20039,500
525817-98Drill · sidetrackTotal E&P USA, Inc.Sep 10, 2003Nov 22, 2002—9,500
525817-99DrillTotalfinaelf E&P USA IncNov 22, 2002Nov 22, 2002—12,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-201906————
—— G-4-235324————

Formation tops

As filed on W-2/G-1. Subsea from 119 ft elevation.Download CSV →

FormationMD ftSubsea
6500' Sand7,868-7,749
6700' Sand8,017-7,898
6500 Sand8,042-7,923
6900 Sand8,503-8,384
Card8,853-8,734
Card9,035-8,916
Callavo9,533-9,414
8200' Sand9,737-9,618
Cullavo9,846-9,727
8200 Sand10,037-9,918
8500' Sand10,039-9,920
8500 Sand10,318-10,199

Perforations

Perforated and open-hole intervals.

FromToType
10,29510,330Perforated
10,33810,384Perforated
10,35010,614Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,38517.52,275 S
9.6258,82312.25935 S
3.510,9356.5215 S
3.511,0906601 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2008Mar 14, 2008Yes
00May 28, 2008——
00Aug 4, 2004May 20, 2004Yes
00Jul 6, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533043, documented in the API reference.