WELL · 42-215-33090 · DISTRICT 4

Coates #2

N

Hidalgo County  · Vertical

Coates #2 (API 42-215-33090) is a permitted well in Hidalgo County filed by El Paso Production Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 2003 and 2006, permitted to 9,700 ft.

Completion filings report one formation top, including Frio.

Operator of record

EL Paso Production Company

Houston, TX · P-5 Y, filed Jul 7, 2006 · 248 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPetrovybe Opco LLCthrough Apr 2026
Latest permitEL Paso Production CompanyMar 29, 2006
9,700
total depth, ft
3
permits on file
Mar 29, 2006
last permit issued
—
completed
0
cumulative oil, bbl
2.11M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coates Y G-4-199583Samano (Fourth Massive)Petrovybe Opco LLC102.11MApr 2003 – Jul 2026
Coates Y G-4-203054Samano (Third Massive)Petrovybe Opco LLC100May 2003 – Jul 2026
Coates Y G-4-203055Samano (Massive 7200)Petrovybe Opco LLC100May 2003 – Jul 2026
Coates Y G-4-203056Samano (2ND Rincon)Petrovybe Opco LLC100Nov 2003 – Jul 2026

Gas, mcf lease total

Last 12 months 6,719 · prior 12 8,241(-18%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thorp Petroleum CorporationApr 2003 → Dec 2004
  2. 2EL Paso Production CompanyJan 2005 → Jul 2006
  3. 3EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
  4. 4Smith Production Inc.Mar 2008 → Mar 2011
  5. 5Legend Natural Gas IV, LPApr 2011 → Feb 2015
  6. 6Trinity River Energy Oper, LLCMar 2015 → Oct 2017
  7. 7Wagner Oil CompanyNov 2017 → Jan 2021
  8. 8Fletcher Operating, LLCFeb 2021 → Nov 2025
  9. 9Petrovybe Opco LLCDec 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
616515-99RecompletionEL Paso Production CompanyMar 27, 2006Mar 29, 2006—9,700
546718-99RecompletionThorp Petroleum CorporationJun 9, 2004Jun 17, 2004Nov 21, 20039,700
529466-99DrillThorp Petroleum CorporationMar 11, 2003Mar 11, 2003Mar 21, 20039,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-199583————
—— G-4-203054————
—— G-4-203055————
—— G-4-203056————

Formation tops

As filed on W-2/G-1. Subsea from 467 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,512-3,045

Perforations

Perforated and open-hole intervals.

FromToType
6,5466,556Perforated
6,5606,566Perforated
7,2587,262Perforated
7,2587,362Perforated
7,3527,362Perforated
7,7987,824Perforated
8,0488,190Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,52814.75810 S
7.6256,2259.875680 S
4.59,3586.5420 S
4.59,3586.75420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 7, 2004Jul 28, 2004—
00Sep 1, 2004——
00Jul 5, 2004May 10, 2004—
00Jun 21, 2004Jan 30, 2004Yes
00Mar 8, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533090, documented in the API reference.