WELL · 42-215-33266 · DISTRICT 4
Mucher J #2
Hidalgo County · Arrowhead Ranch (Vicks 13 200) field · Vertical
Mucher J #2 (API 42-215-33266) is a well in Hidalgo County operated by Denali Oil & Gas Management LLC, completed March 5, 2005.
The RRC has issued one drilling permit, issued October 6, 2004, permitted to 16,000 ft.
Completion filings report 5 formation tops, including Sullivan, Rincon, 13,200 Sand, 13200' Sand.
No lease production has been reported under this well’s leases.
Operator of record
Denali Oil & Gas Management LLC
Houston, TX · P-5 Y, filed May 3, 2013 · 94 permits on file · (281) 847-1888
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denali Oil & Gas Management LLC |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Denali Oil & Gas Management, LLCOct 6, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 1
- permits on file
- Oct 6, 2004
- last permit issued
- Mar 5, 2005
- completed
- 0
- cumulative oil, bbl
- 3.11M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 5, 2005
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mucher, J et AL G-4-209633 | Arrowhead Ranch (VKS 12,300) | Hilcorp Energy Company | 1 | 0 | 3.11M | Mar 2005 – Jul 2026 |
| Mucher, J G-4-209467 | Arrowhead Ranch (Vicks 13,200) | Denali Oil & Gas Management, LLC | 1 | 0 | 0 | Mar 2005 – Mar 2005 |
Gas, mcf lease total
Last 12 months 34,966 · prior 12 37,372(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Denali Oil & Gas Management, LLCMar 2005 → Jan 2006
- 2Chesapeake Operating, Inc.Feb 2006 → Aug 2014
- 3Hilcorp Energy CompanySep 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 551958-99 | Drill | Denali Oil & Gas Management, LLC | Oct 6, 2004 | Oct 6, 2004 | Dec 9, 2004 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-209467 | — | — | — | — |
| — | — G-4-209633 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 361 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Sullivan | 5,420 | -5,059 |
| Rincon | 10,565 | -10,204 |
| 13,200 Sand | 12,650 | -12,289 |
| 13200' Sand | 12,650 | -12,289 |
| 13,200' SD | 12,650 | -12,289 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,818 | 11,892 | Perforated |
| 11,818 | 12,494 | Perforated |
| 12,240 | 12,494 | Perforated |
| 12,688 | 13,298 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,505 | 17.5 | 1,970 S |
| 5 | 7,789 | 8.5 | 1,175 S |
| 9.625 | 11,200 | 12.25 | 769 S |
| 9.625 | 11,200 | 12.75 | 769 S |
| 5 | 13,700 | 8.5 | 1,175 S |
| 4.5 | 13,700 | 8.5 | — |
| 4.5 | 13,700 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 2007 | Aug 17, 2007 | — |
| 00 | Jul 5, 2007 | Jun 15, 2007 | — |
| 00 | May 23, 2007 | Apr 27, 2007 | — |
| 00 | Nov 30, 2005 | Jul 25, 2005 | — |
| 00 | Sep 28, 2005 | Mar 14, 2005 | Yes |
| 00 | Sep 22, 2005 | Apr 11, 2005 | Yes |
| 00 | Jul 25, 2005 | — | — |
| 00 | Jul 20, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-33266 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-33266 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21533266, documented in the API reference.