WELL · 42-215-33452 · DISTRICT 4

Barrera C. Dr. #1

Y

Hidalgo County · EL Staggs (7330) field · Temp Abandoned  · Vertical

Barrera C. DR. #1 (API 42-215-33452) is a well in Hidalgo County operated by Hilcorp Energy Company, completed September 6, 2008 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits between 2006 and 2009, permitted to 12,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Vicksburg, P Sand.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2019
Latest permitChesapeake Operating, Inc.Jan 21, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Jan 21, 2009
last permit issued
Sep 6, 2008
completed
0
cumulative oil, bbl
1.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 6, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barrera, C., Dr. G-4-219414McMoran (8960)Hilcorp Energy Company10217KMay 2006 – Jul 2026
Barrera, C., Dr. G-4-245407EL Staggs (7330)Hilcorp Energy Company101.2MSep 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sierra Resources, LLCMay 2006 → Jun 2006
  2. 2Chesapeake Operating, Inc.Jul 2006 → Aug 2014
  3. 3Hilcorp Energy CompanySep 2014 → Aug 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
677512-99RecompletionChesapeake Operating, Inc.Jan 16, 2009Jan 21, 2009Aug 24, 200812,000
615386-99DrillSierra Resources, LLCMar 7, 2006Mar 7, 2006Mar 25, 20069,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-219414————
—— G-4-245407————

Formation tops

As filed on W-2/G-1. Subsea from 226 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,710-3,484
Vicksburg6,420-6,194
P Sand7,224-6,998
Vicksburg8,660-8,434

Perforations

Perforated and open-hole intervals.

FromToType
7,0707,260Perforated
8,5608,585Perforated
8,6608,676Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,51617.51,480 S
7.6257,50012.251,095 S
4.58,7406.75215 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 2009Oct 2, 2008Yes
00Mar 6, 2009——
00Feb 22, 2007Jun 23, 2006—
00Feb 21, 2007Jun 1, 2006—
00Feb 8, 2007May 10, 2006Yes
00Sep 26, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533452, documented in the API reference.