WELL · 42-215-33514 · DISTRICT 4
Devon #2
Hidalgo County · Nichols (3100) field · Vertical
Devon #2 (API 42-215-33514) is a plugged well in Hidalgo County, plugged March 16, 2026, last operated by Fargo Oil & Gas LLC.
The RRC has issued one drilling permit, issued August 10, 2006, permitted to 5,500 ft.
It was permitted by Greehey & Company, Ltd. and has since transferred to Fargo Oil & Gas LLC on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Greehey & Company, Ltd.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Aug 4, 2025 · (956) 434-8343
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fargo Oil & Gas LLC |
| Production reports | Fargo Oil & Gas, LLCthrough May 2023 |
| Latest permit | Greehey & Company, Ltd.Aug 10, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- Aug 10, 2006
- last permit issued
- Feb 15, 2007
- completed
- 0
- cumulative oil, bbl
- 41.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 15, 2007
- Shut in
- —
- Plugged
- Mar 16, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Devon G-4-233966 | Nichols (3100) | Fargo Oil & Gas, LLC | 1 | 0 | 41.4K | Feb 2007 – Mar 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greehey & Company, Ltd.Feb 2007 → Dec 2007
- 2Reveille ResourcesJan 2008 → Feb 2010
- 3Reveille Resources (Texas), Inc.Mar 2010 → May 2012
- 4Bruington Operating, L.L.C.Jun 2012 → Apr 2014
- 5Fordyce Oil & GasMay 2014 → May 2020
- 6Fordyce Oil & Gas, LLCAug 2020 → Nov 2021
- 7Fargo Oil & Gas, LLCDec 2021 → May 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 623487-99 | Drill | Greehey & Company, Ltd. | Jul 31, 2006 | Aug 10, 2006 | Sep 21, 2006 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-233966 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 180 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,195 | 3,207 | Perforated |
| 3,210 | 3,214 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 288 | 12.25 | 195 S |
| 4.5 | 4,986 | 7.875 | 765 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 31, 2008 | Jan 25, 2008 | Yes |
| 00 | Mar 24, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-33514 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-33514 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21533514, documented in the API reference.