WELL · 42-219-35124 · DISTRICT 8
Hunt-Slaughter #14
Hockley County · Slaughter field · Vertical
Hunt-Slaughter #14 (API 42-219-35124) is a plugged well in Hockley County, plugged September 28, 2021, last operated by Burk Royalty CO. Ltd..
The RRC has issued one drilling permit, issued August 13, 1987, permitted to 5,250 ft.
It was permitted by Hunt, N. B. and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.
Completion filings report one formation top, including San Andres.
Its lease has reported 365K barrels of oil and 36.4K mcf of gas since January 1993, last reporting in January 2024. The lease carries 24 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Hunt, N. B.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Nov 4, 2025 · 382 permits on file · (940) 232-5537
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Co. Ltd. |
| Production reports | Rocker a Operating Companythrough Jul 2021 |
| Latest permit | Hunt, N. B.Aug 13, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,250
- total depth, ft
- 1
- permits on file
- Aug 13, 1987
- last permit issued
- Sep 28, 1987
- completed
- 365K
- cumulative oil, bbl
- 36.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 28, 1987
- Shut in
- —
- Plugged
- Sep 28, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hunt-Slaughter O-11-60512 | Slaughter | Burk Royalty Co., Ltd. | 24 | 365K | 36.4K | Jan 1993 – Jan 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wheeler Operating CorporationJan 1993 → Jul 2002
- 2Rocker a Operating CompanyAug 2002 → Jul 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 334286-99 | Drill | Hunt, N. B. | Aug 10, 1987 | Aug 13, 1987 | — | 5,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-60512 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,495 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AndresSAN ANDRES POROSITY | 5,020 | -1,525 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,020 | 5,040 | Perforated |
| 5,048 | 5,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 475 | 12.25 | 325 S |
| 5.5 | 5,108 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 1987 | Oct 23, 1987 | Yes |
| 00 | Nov 5, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-219-35124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-219-35124 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21935124, documented in the API reference.