WELL · 42-219-36165 · DISTRICT 11

Ropes Canyon Reef Unit #601 D

Plugged

Hockley County  · Vertical

Ropes Canyon Reef Unit #601 D (API 42-219-36165) is a plugged well in Hockley County, plugged December 20, 2008, last operated by Springfield Oil Services, Inc..

The RRC has issued 2 drilling permits (amended once) between 1995 and 2008, permitted to 11,500 ft.

Operator of record

Springfield Oil Services, Inc.

Mamaroneck, NY · P-5 Y, filed Aug 4, 2025 · 200 permits on file · (914) 473-2578

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSpringfield Oil Services, Inc.Dec 5, 2008
11,500
total depth, ft
3
permits on file
Dec 5, 2008
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 20, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
674175-99ReenterSpringfield Oil Services, Inc.Oct 30, 2008Dec 5, 2008Dec 13, 200811,500
435823-98DrillSpringfield Oil Services Inc.Aug 22, 1995May 12, 1995—11,500
435823-99DrillSpringfield Oil Services Inc.May 12, 1995May 12, 1995Jul 22, 199510,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099561W-14 DisposalPlugged Jun 15, 200915,0004,9009,800–11,500

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936165, documented in the API reference.