WELL · 42-221-30797 · DISTRICT 7
Black Ranch #29
Hood County · Cockrell (Strawn) field · Vertical
Black Ranch #29 (API 42-221-30797) is a plugged well in Hood County, plugged August 6, 2020, last operated by E.G. Operating.
The RRC has issued 2 drilling permits between 1987 and 1993, permitted to 3,350 ft.
Completion filings report 3 formation tops, including Parks Lime, Caddo, Atoka.
Operator of record
Dallas, TX · P-5 Y, filed Sep 6, 2002 · 72 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | E.G. Operating |
| Production reports | XTO Energy Inc.through Dec 2018 |
| Latest permit | E.G. OperatingNov 16, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,350
- total depth, ft
- 2
- permits on file
- Nov 16, 1993
- last permit issued
- Jan 21, 1987
- completed
- 0
- cumulative oil, bbl
- 222K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 21, 1987
- Shut in
- —
- Plugged
- Aug 6, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black Ranch G-8-147517 | Black Ranch (Strawn 1500) | XTO Energy Inc. | 1 | 0 | 210K | Sep 1993 – Aug 2020 |
| Black Ranch G-8-123228 | Cockrell (Strawn) | E.G. Operating | 1 | 0 | 11.7K | Jan 1993 – Sep 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lynx Energy Company, Inc.Jan 1993 → Mar 1993
- 2E.G. OperatingApr 1993 → Apr 1996
- 3Simpson Oil & Land Co.May 1996 → Jun 1998
- 4Dabb Energy CompanyJul 1998 → Jul 2004
- 5XTO Energy Inc.Aug 2004 → Dec 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416462-99 | Recompletion | E.G. Operating | Sep 27, 1993 | Nov 16, 1993 | Sep 4, 1993 | 1,755 |
| 325166-99 | Drill | Fossil Fuels Inc. | Jan 7, 1987 | Jan 7, 1987 | — | 3,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-123228 | — | — | — | — |
| — | — G-8-147517 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 834 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,514 | 1,522 | Perforated |
| 2,556 | 2,683 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 258 | 12.25 | 160 S |
| 4.5 | 3,007 | — | 225 S |
| 4.5 | 3,007 | 6.25 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 16, 1994 | Sep 27, 1993 | Yes |
| 00 | Dec 31, 1993 | — | — |
| 00 | Feb 20, 1987 | Feb 9, 1987 | Yes |
| 00 | Feb 19, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-221-30797 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-221-30797 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22130797, documented in the API reference.