WELL · 42-221-30977 · DISTRICT 9
Dove Wallace #1
Hood County · Newark East (Barnett Shale) field · Vertical
Dove Wallace #1 (API 42-221-30977) is a plugged well in Hood County, plugged November 17, 2009, last operated by Initial Energy Services LLC.
The RRC has issued one drilling permit, issued December 10, 2001, permitted to 5,200 ft.
It was permitted by Richman Petroleum Corp. and has since transferred to Initial Energy Services LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Barnett.
Operator of record
Permitted by Richman Petroleum Corp.; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (210) 822-1221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Initial Energy Services LLC |
| Production reports | none |
| Latest permit | Richman Petroleum Corp.Dec 10, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Dec 10, 2001
- last permit issued
- Feb 4, 2002
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2001 THROUGH Nov 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 4, 2002
- Shut in
- —
- Plugged
- Nov 17, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dove, Wallace G-13-190520 | Newark, East (Barnett Shale) | Initial Energy Services, LLC | 1 | 0 | 0 | Dec 2001 – Nov 2009 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 515954-99 | Drill | Richman Petroleum Corp. | Dec 10, 2001 | Dec 10, 2001 | Dec 30, 2001 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-190520 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 878 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoCADDO LM. | 3,625 | -2,747 |
| Marble Falls | 4,020 | -3,142 |
| BarnettBARNETT SHALE | 4,630 | -3,752 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,090 | 5,100 | Perforated |
| 5,116 | 5,126 | Perforated |
| 5,156 | 5,166 | Perforated |
| 5,170 | 5,180 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 366 | 11.25 | 325 S |
| 5.5 | 5,270 | 7.875 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 2003 | Dec 23, 2002 | — |
| 00 | Oct 8, 2002 | Jul 1, 2002 | Yes |
| 00 | Sep 24, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-221-30977 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-221-30977 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094253 | H-1 Injection | Canceled Jan 16, 2014 | 5,000 | 1,240 | 2,480–4,270 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22130977, documented in the API reference.