WELL · 42-225-00294 · DISTRICT 6
Hill C.C. #B 1R
Houston County · Navarro Crossing (Woodbine) field · Vertical
Hill C.C. #B 1R (API 42-225-00294) is a plugged well in Houston County, plugged January 26, 1996, last operated by Bryant - Chase Energy Corp..
The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 6,400 ft.
It was permitted by Bryant & Carr, Inc. and has since transferred to Bryant - Chase Energy Corp. on the wellbore schedule.
Completion filings report 3 formation tops, including Subclarksville, Woodbine, Dexter.
Operator of record
Permitted by Bryant & Carr, Inc.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Apr 2, 2004 · 4 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bryant - Chase Energy Corp. |
| Production reports | none |
| Latest permit | Bryant & Carr, Inc.May 9, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,400
- total depth, ft
- 2
- permits on file
- May 9, 1991
- last permit issued
- May 2, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 2, 1991
- Shut in
- —
- Plugged
- Jan 26, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hill, C.C. O-6-12849 | Navarro Crossing (Woodbine) | Bryant - Chase Energy Corp. | 1 | 0 | 0 | Jan 1993 – Jun 1996 |
| — G-6-138058 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 387669-99 | Recompletion | Bryant & Carr, Inc. | May 9, 1991 | May 9, 1991 | May 1, 1991 | 6,080 |
| 377052-99 | Other | Bryant & Carr, Inc. | Aug 24, 1990 | Aug 24, 1990 | Sep 5, 1990 | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-138058 | — | — | — | — |
| — | — O-6-12849 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 233 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Subclarksville | 5,593 | -5,360 |
| Woodbine | 5,750 | -5,517 |
| Dexter | 6,149 | -5,916 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,762 | 5,766 | Perforated |
| 6,149 | 6,159 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 735 | — | — |
| 5.5 | 5,887 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 24, 1991 | May 8, 1991 | Yes |
| 00 | Jun 27, 1991 | — | — |
| 00 | Jun 13, 1991 | Mar 14, 1991 | — |
| 00 | May 10, 1991 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-225-00294 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-225-00294 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22500294, documented in the API reference.