WELL · 42-225-30466 · DISTRICT 6
Murray A. E. #02
Houston County · Reynard (Pettit) field · Vertical
Murray A. E. #02 (API 42-225-30466) is a plugged well in Houston County, plugged August 1, 2012, last operated by Culver & Cain Production LLC.
The RRC has issued one drilling permit, issued February 4, 1983, permitted to 12,000 ft.
It was permitted by Moore-Mccormack Oil & Gas Corp. and has since transferred to Culver & Cain Production LLC on the wellbore schedule.
Operator of record
Permitted by Moore-McCormack Oil & Gas Corp.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Sep 4, 2025 · 11 permits on file · (903) 571-2364
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Culver & Cain Production LLC |
| Production reports | Culver & Cain Production LLCthrough May 2012 |
| Latest permit | Moore-McCormack Oil & Gas Corp.Feb 4, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Feb 4, 1983
- last permit issued
- Apr 18, 1983
- completed
- 0
- cumulative oil, bbl
- 1.77M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 18, 1983
- Shut in
- —
- Plugged
- Aug 1, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Murray, A. E. G-6-105466 | Reynard (Pettit) | Culver & Cain Production LLC | 1 | 0 | 1.77M | Jan 1993 – Jul 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cxy Energy Inc.Jan 1993 → Jun 1995
- 2Antara Resources, Inc.Jul 1995 → Jun 2000
- 3Calpine Natural Gas CompanyJul 2000 → Apr 2002
- 4Calpine Natural Gas Company L.P.May 2002 → Jul 2002
- 5Calpine Natural Gas L.P.Aug 2002 → Dec 2005
- 6Rosetta Resources Operating LPJan 2006 → Nov 2009
- 7Culver & Cain Production LLCJan 2010 → May 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 185413-99 | Drill | Moore-McCormack Oil & Gas Corp. | Feb 4, 1983 | Feb 4, 1983 | Feb 21, 1983 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-105466 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,350 | 10,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,603 | 12.25 | 1,350 S |
| 2.375 | 10,159 | — | — |
| 5.5 | 11,502 | 8.75 | 2,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 16, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-225-30466 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-225-30466 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22530466, documented in the API reference.