WELL · 42-225-30862 · DISTRICT 6

USA-NM-A-19772 (Tex) #12

N

Houston County  · Vertical

USA-NM-A-19772 (Tex) #12 (API 42-225-30862) is a disposal or injection well in Houston County operated by Range Production Company under an active UIC permit.

The RRC has issued 2 drilling permits between 1992 and 2003, permitted to 1,800 ft.

Completion filings report 3 formation tops, including Queen, Carrizo, Wilcox.

Its 2 leases have reported 513K barrels of oil and 27 mcf of gas since January 1993, last reporting in July 2026. The leases carry 31 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 584 barrels injected in the 12 months reported through December 2025.

Operator of record

Range Production Company

Fort Worth, TX · P-5 Y, filed Nov 6, 2015 · 1,666 permits on file · (817) 980-4254

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHD Operating Co, LLCthrough Jan 2026
Latest permitRange Production CompanyJan 23, 2003
1,800
total depth, ft
2
permits on file
Jan 23, 2003
last permit issued
—
completed
513K
cumulative oil, bbl
27
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 31 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
USA-NM-A 19772 (Tex) O-6-14254Laura la Velle, E. (Carrizo)HD Operating Co, LLC14167K0Aug 2003 – Jul 2026
USA-NM-A 19772 (Tex) O-6-10769Laura la Velle, S. (1600)Range Production Company17346K27Jan 1993 – Oct 2003

Oil, barrels lease total

Last 12 months 1,417 · prior 12 2,851(-50%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Valley Resources, Inc.Jan 1993 → Mar 1993
  2. 2Lomak Production CompanyApr 1993 → Aug 1998
  3. 3Range Production CompanySep 1998 → Dec 2007
  4. 4Basa Resources, Inc.Jan 2008 → Mar 2024
  5. 584 Energy LLCApr 2024 → Oct 2025
  6. 6HD Operating Co, LLCDec 2025 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527301-99RecompletionRange Production CompanyJan 15, 2003Jan 23, 2003—1,700
401066-99DrillValley Resources, Inc.Jul 10, 1992Jul 14, 1992Jan 13, 19931,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-10769————
—— O-6-14254————

Formation tops

As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →

FormationMD ftSubsea
Queen1,296-951
Carrizo1,500-1,155
Carrizo1,546-1,201
Wilcox1,570-1,225
Wilcox1,606-1,261

Perforations

Perforated and open-hole intervals.

FromToType
1,5711,576Perforated
1,6071,660Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6076.7590 S
4.51,6077.875330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 28, 2014Feb 5, 2014—
00Sep 23, 2003Mar 10, 1993Yes
00Dec 9, 1993Mar 10, 1993Yes
00May 21, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

584
bbl, last 12 reported months
7.38M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092790H-1 InjectionActive5,0007501,607–1,660

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 584 · prior 12 19,238(-97%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22530862, documented in the API reference.