WELL · 42-225-31219 · DISTRICT 3
Eastham State Prison Farm #0502
Houston County · Vertical
Eastham State Prison Farm #0502 (API 42-225-31219) is a permitted well in Houston County filed by Navidad Resources, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 2008 and 2011, permitted to 13,000 ft.
Completion filings report 3 formation tops, including Austin Chalk, Woodbine, Buda.
Its lease has reported 355K barrels of oil and 990K mcf of gas since March 2011, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Bullard, TX · P-5 Y, filed Jul 2, 2015 · 113 permits on file · (903) 714-8911
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Trailblazer Energy Resources,llcthrough Apr 2026 |
| Latest permit | Navidad Resources, LLCDec 23, 2011 |
- 13,000
- total depth, ft
- 3
- permits on file
- Dec 23, 2011
- last permit issued
- —
- completed
- 355K
- cumulative oil, bbl
- 990K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eastham State Prison Farm O-3-26074 | Fort Trinidad, East (Buda) | Trailblazer Energy Resources,llc | 5 | 355K | 990K | Mar 2011 – Jul 2026 |
Gas, mcf lease total
Last 12 months 36,046 · prior 12 33,275(+8%)
Oil, barrels lease total
Last 12 months 4,624 · prior 12 4,538(+2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Navidad Resources, LLCMar 2011 → Aug 2013
- 2Sem Operating Company LLCSep 2013 → Feb 2020
- 3Etx Energy, LLCMar 2020 → Jul 2022
- 4Trailblazer Energy Resources,llcAug 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 730413-98 | Drill | Navidad Resources, LLC | Jul 18, 2012 | Dec 23, 2011 | Jan 25, 2012 | 10,115 |
| 730413-99 | Drill | Navidad Resources, LLC | Dec 20, 2011 | Dec 23, 2011 | Jan 25, 2012 | 13,000 |
| 663528-99 | Drill | Cordillera Energy Prtnrs Iii,llc | Jun 3, 2008 | Jun 19, 2008 | — | 12,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-26074 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 190 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,626 | -8,436 |
| Woodbine | 8,974 | -8,784 |
| Buda | 9,896 | -9,706 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,896 | 10,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,072 | 12.25 | 1,135 S |
| 7 | 9,485 | 8.75 | 410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 2013 | Aug 7, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-225-31219 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-225-31219 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22531219, documented in the API reference.