WELL · 42-225-31222 · DISTRICT 3

Eastham State Prison Farm #2

Y

Houston County · Fort Trinidad East (Buda) field · Shut IN  · Vertical

Eastham State Prison Farm #2 (API 42-225-31222) is a well in Houston County operated by Trailblazer Energy Resources LLC, completed March 31, 2012 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued January 27, 2012, permitted to 10,800 ft.

It was permitted by Navidad Resources, LLC and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Woodbine, Buda.

Its lease has reported 355K barrels of oil and 990K mcf of gas since March 2011, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Navidad Resources, LLC; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Aug 4, 2025 · 30 permits on file · (866) 598-1407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsTrailblazer Energy Resources,llcthrough Apr 2026
Latest permitNavidad Resources, LLCJan 27, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
1
permits on file
Jan 27, 2012
last permit issued
Mar 31, 2012
completed
355K
cumulative oil, bbl
990K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 31, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eastham State Prison Farm O-3-26074Fort Trinidad, East (Buda)Trailblazer Energy Resources,llc5355K990KMar 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 36,046 · prior 12 33,275(+8%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 4,624 · prior 12 4,538(+2%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Navidad Resources, LLCMar 2011 → Aug 2013
  2. 2Sem Operating Company LLCSep 2013 → Feb 2020
  3. 3Etx Energy, LLCMar 2020 → Jul 2022
  4. 4Trailblazer Energy Resources,llcAug 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
732035-99DrillNavidad Resources, LLCJan 19, 2012Jan 27, 2012Feb 4, 201210,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26074————

Formation tops

As filed on W-2/G-1. Subsea from 193 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk8,540-8,347
Woodbine8,860-8,667
Buda9,800-9,607

Perforations

Perforated and open-hole intervals.

FromToType
9,8109,856Perforated
9,9009,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,01512.251,135 S
5.59,9248.75950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 9, 2013Mar 19, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22531222, documented in the API reference.