WELL · 42-225-31250 · DISTRICT 6
Gamble #1
Houston County · Fort Trinidad East (Buda) field · NO Production · Vertical
Gamble #1 (API 42-225-31250) is a well in Houston County operated by Proline Energy Resources Inc, completed October 29, 2013 and listed as no production on the RRC schedule.
The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 13,500 ft.
It was permitted by Interstate Explorations LLC and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report 5 formation tops, including Buda, Georgetown, Edwards, Glen Rose.
Its 2 leases have reported 38.1K barrels of oil and 48.4K mcf of gas since May 2013, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Interstate Explorations LLC; the EWA schedule now lists a different operator.
Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (832) 930-4455
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough Dec 2024 |
| Latest permit | Interstate Explorations LLCApr 7, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 2
- permits on file
- Apr 7, 2014
- last permit issued
- Oct 29, 2013
- completed
- 38.1K
- cumulative oil, bbl
- 48.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 29, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gamble G-6-271324 | Wildcat | Proline Energy Resources Inc | 1 | 0 | 0 | May 2013 – Jul 2026 |
| Gamble O-3-26630 | Fort Trinidad, East (Buda) | Proline Energy Resources Inc | 1 | 38.1K | 48.4K | May 2013 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 50(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Interstate Explorations LLCAug 2013 → Apr 2014
- 2EOG Resources, Inc.May 2014 → Dec 2016
- 3Fortune Resources LLCJan 2017 → Jul 2018
- 4Proline Energy Resources IncAug 2018 → Dec 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 782157-99 | Recompletion | Interstate Explorations LLC | Mar 13, 2014 | Apr 7, 2014 | Aug 12, 2013 | 13,500 |
| 748351-99 | Drill | Interstate Explorations LLC | Sep 17, 2012 | Sep 25, 2012 | Oct 31, 2012 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-271324 | — | — | — | — |
| — | — O-3-26630 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 324 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buda | 8,800 | -8,476 |
| Georgetown | 8,877 | -8,553 |
| Georgetown | 8,880 | -8,556 |
| Edwards | 9,445 | -9,121 |
| Edwards | 9,448 | -9,124 |
| Glen Rose | 9,940 | -9,616 |
| James Lime | 12,360 | -12,036 |
| James Lime | 12,369 | -12,045 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,830 | 10,550 | Perforated |
| 9,020 | 9,264 | Perforated |
| 9,452 | 9,728 | Perforated |
| 9,980 | 9,992 | Perforated |
| 10,068 | 10,146 | Perforated |
| 10,220 | 10,364 | Perforated |
| 10,416 | 10,550 | Perforated |
| 12,384 | 12,526 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,128 | 14.75 | 1,646 S |
| 7 | 11,395 | 9.875 | 1,991 S |
| 4.5 | 12,798 | 6.125 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 2015 | Apr 16, 2014 | Yes |
| 00 | Feb 10, 2014 | Aug 19, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-225-31250 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-225-31250 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22531250, documented in the API reference.