WELL · 42-225-31321 · DISTRICT 3

Crowson-Nash Unit #101

N

Houston County · Fort Trinidad East (Georgetown) field  · Directional

Crowson-Nash Unit #101 (API 42-225-31321) is a well in Houston County operated by Energy & Expl. Prtnrs Oper. LP, completed May 21, 2014.

The RRC has issued one drilling permit (amended once), issued May 1, 2014, permitted to 10,900 ft.

It was permitted by Treadstone Energy Partners, LLC and has since transferred to Energy & Expl. Prtnrs Oper. LP on the wellbore schedule.

Completion filings report 11 formation tops, including Austin Chalk, Buda, Edwards, Georgetown.

Its 2 leases have reported 19.4K barrels of oil and 35.3K mcf of gas since May 2014, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Energy & Expl. Prtnrs Oper. LP

Permitted by Treadstone Energy Partners, LLC; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Jul 7, 2017 · 118 permits on file · (972) 989-2352

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnergy & Expl. Prtnrs Oper. LP
Production reportsPardus Oil & Gas Operating, LPthrough Jul 2018
Latest permitTreadstone Energy Partners, LLCMay 1, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,900
total depth, ft
2
permits on file
May 1, 2014
last permit issued
May 21, 2014
completed
19.4K
cumulative oil, bbl
35.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 21, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crowson-Nash Unit O-3-26469Fort Trinidad, East (Buda)Empire Texas Operating LLC219.4K35.3KJun 2014 – Jul 2026
Crowson-Nash Unit O-3-26468Fort Trinidad, East (Georgetown)Energy & Expl. Prtnrs Oper., LP100May 2014 – Apr 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy & Expl. Prtnrs Oper., LPOct 2014 → Sep 2016
  2. 2Pardus Oil & Gas Operating, LPOct 2016 → Jul 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
783596-98DrillTreadstone Energy Partners, LLCMay 7, 2014May 1, 2014May 5, 201410,900
783596-99DrillTreadstone Energy Partners, LLCApr 1, 2014May 1, 2014—10,225

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26468————
—— O-3-26469————

Formation tops

As filed on W-2/G-1. Subsea from 239 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk——
Buda——
Edwards——
Georgetown——
Glen Rose——
Glen RoseGLEN ROSE A——
Pecan Gap——
PettitPETTET——
Rodessa——
Sub-Clarksville——
Travis Peak——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
9,7489,796Perforated
9,8229,926Perforated
9,95610,097Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,36012.251,365 S
5.510,9008.75940 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 31, 2015Jun 4, 2015Yes
00Oct 23, 2014Oct 7, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22531321, documented in the API reference.