WELL · 42-225-31402 · DISTRICT 6

Eastham State Prison Farm #0811

N

Houston County · Eastham State Farm (Glenrose) field  · Vertical

Eastham State Prison Farm #0811 (API 42-225-31402) is a well in Houston County operated by Etx Energy LLC, completed October 20, 2017.

The RRC has issued one drilling permit, issued February 23, 2017, permitted to 13,000 ft.

It was permitted by Sem Operating Company LLC and has since transferred to Etx Energy LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Sub-Clarksville, Woodbine, Buda, Edwards.

Its 2 leases have reported 15.2K barrels of oil and 974K mcf of gas since October 2017, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Etx Energy LLC

Permitted by Sem Operating Company LLC; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Apr 6, 2023 · 38 permits on file · (866) 598-1407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEtx Energy LLC
Production reportsTrailblazer Energy Resources,llcthrough Apr 2026
Latest permitSem Operating Company LLCFeb 23, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Feb 23, 2017
last permit issued
Oct 20, 2017
completed
15.2K
cumulative oil, bbl
974K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 20, 2017
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eastham State Prison Farm G-6-293147Eastham State Farm (Glenrose)Trailblazer Energy Resources,llc10340KJul 2022 – Jul 2026
Eastham State Prison Farm O-6-15613Eastham State Farm (Glenrose)Etx Energy, LLC115.2K634KOct 2017 – Oct 2022

Gas, mcf lease total

Last 12 months 80,252 · prior 12 81,501(-2%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sem Operating Company LLCOct 2017 → Feb 2020
  2. 2Etx Energy, LLCMar 2020 → Jul 2022
  3. 3Trailblazer Energy Resources,llcAug 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823165-99DrillSem Operating Company LLCFeb 13, 2017Feb 23, 2017Jun 25, 201713,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-293147————
—— O-6-15613————

Formation tops

As filed on W-2/G-1. Subsea from 210 ft elevation.Download CSV →

FormationMD ftSubsea
Sub-Clarksville5,525-5,315
Woodbine9,100-8,890
Buda9,580-9,370
Edwards9,680-9,470
Glen Rose9,700-9,490
PettitPETTET——
Rodessa——
Travis Peak——

Perforations

Perforated and open-hole intervals.

FromToType
11,72612,106Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,03012.251,895 S
5.512,3038.751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 2022Aug 1, 2022—
00Aug 31, 2018May 3, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.