WELL · 42-227-04206 · DISTRICT 8
Haagen, Helen #2
Howard County · Vertical
Haagen, Helen #2 (API 42-227-04206) is a plugged well in Howard County, plugged January 11, 1999, last operated by Lobo Oil Corporation.
The RRC has issued 2 drilling permits in 1985, permitted to 7,485 ft.
Completion filings report 2 formation tops, including San Andres, Clear Fork.
Operator of record
Snyder, TX · P-5 Y, filed May 15, 1987 · 47 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Lobo Oil CorporationAug 5, 1985 |
- 7,485
- total depth, ft
- 2
- permits on file
- Aug 5, 1985
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 11, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haagen, Helen O-10-29890 | Vincent, North (Clear Fork) | Lakewood Operating, Ltd. | 1 | 0 | 0 | Jan 1993 – Feb 1999 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 282555-99 | Other | Lobo Oil Corporation | Aug 5, 1985 | Aug 5, 1985 | — | 4,600 |
| 278492-99 | Other | Lobo Oil Corporation | Jun 20, 1985 | Jun 21, 1985 | — | 7,485 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-29890 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,368 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,300 | 68 |
| Clear ForkCLEARFORK | 3,500 | -1,132 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,990 | 4,012 | Perforated |
| 4,511 | 4,523 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,316 | — | — |
| 8.625 | 2,318 | 11 | 1,400 S |
| 8.625 | 2,318 | — | — |
| 4.5 | 4,567 | — | — |
| 2.375 | 7,360 | — | — |
| 4.5 | 7,436 | 7.875 | 450 S |
| 4.5 | 7,485 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 3, 1987 | Jun 15, 1987 | — |
| 00 | Jun 24, 1987 | Aug 23, 1985 | — |
| 00 | Sep 17, 1985 | Aug 23, 1985 | — |
| 00 | Sep 10, 1985 | — | — |
| 00 | Jan 12, 1984 | May 30, 1960 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-04206 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-04206 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 99.8K
- bbl, last 12 reported months
- 398K
- bbl, all reported
- Dec 1998
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062876 | W-14 Disposal | Plugged Jan 26, 1999 | 400 | 300 | 3,990–4,012 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 99,804 · prior 12 133,631(-25%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22704206, documented in the API reference.