WELL · 42-227-32325 · DISTRICT 8
Flanagan #3
Howard County · Red Draw (Miss) field · Vertical
Flanagan #3 (API 42-227-32325) is a plugged well in Howard County, plugged February 11, 1994, last operated by Pct Oil CO..
The RRC has issued 2 drilling permits between 1980 and 1982, permitted to 9,800 ft.
It was permitted by North American Royalties, Inc. and has since transferred to Pct Oil CO. on the wellbore schedule.
Its lease has reported 1.17K barrels of oil and 15.6K mcf of gas since January 1993, last reporting in April 1994. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by North American Royalties, Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Jun 10, 1994
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | PCT Oil Co. |
| Production reports | PCT Oil Co.through Jan 1994 |
| Latest permit | North American Royalties, Inc.Oct 20, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,800
- total depth, ft
- 2
- permits on file
- Oct 20, 1982
- last permit issued
- Oct 24, 1982
- completed
- 1.17K
- cumulative oil, bbl
- 15.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 24, 1982
- Shut in
- —
- Plugged
- Feb 11, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flanagan O-10-26094 | Red Draw (Miss) | PCT Oil Co. | 3 | 1.17K | 15.6K | Jan 1993 – Apr 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1PCT Oil Co.Jan 1993 → Jan 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 174962-99 | Recompletion | North American Royalties, Inc. | Oct 20, 1982 | Oct 20, 1982 | — | 9,554 |
| 103426-99 | Drill | North American Royalties, Inc. | Dec 30, 1980 | Dec 30, 1980 | Feb 18, 1981 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-26094 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,200 | 9,242 | Perforated |
| 9,478 | 9,490 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 272 | 17.5 | 375 S |
| 8.625 | 3,476 | 11 | 1,300 S |
| 2.375 | 9,076 | — | — |
| 2.375 | 9,283 | — | — |
| 5.5 | 9,553 | 7.875 | 975 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 12, 1982 | — |
| 00 | Jan 12, 1984 | May 14, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-32325 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-32325 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22732325, documented in the API reference.