WELL · 42-227-33359 · DISTRICT 8
Wilkinson H. H. -A- #3A
Howard County · Moore field · Vertical
Wilkinson H. H. -A- #3A (API 42-227-33359) is a plugged well in Howard County, plugged December 7, 2022, last operated by Msd Operating LLC.
The RRC has issued one drilling permit, issued March 5, 1984, permitted to 3,500 ft.
It was permitted by Smith Producing Company and has since transferred to Msd Operating LLC on the wellbore schedule.
Completion filings report one formation top, including San Andres.
Its lease has reported 13.1K barrels of oil and 217 mcf of gas since January 1993, last reporting in June 2023. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Smith Producing Company; the EWA schedule now lists a different operator.
Big Spring, TX · P-5 Y, filed Nov 4, 2025 · (432) 466-9848
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MSD Operating LLC |
| Production reports | MSD Operating, LLCthrough Nov 2022 |
| Latest permit | Smith Producing CompanyMar 5, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Mar 5, 1984
- last permit issued
- Aug 6, 1984
- completed
- 13.1K
- cumulative oil, bbl
- 217
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 6, 1984
- Shut in
- —
- Plugged
- Dec 7, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilkinson, H. H. -A- O-10-28937 | Moore | MSD Operating, LLC | 6 | 13.1K | 217 | Jan 1993 – Jun 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1A a Production Inc.Jan 1993 → Oct 1996
- 2Wash, Robert C.Dec 1996 → Dec 1997
- 3Wash, Robert C. Inc.Jan 1998 → Feb 2008
- 4Breyman Producing, LLCMar 2008 → Sep 2014
- 5MSD Operating, LLCOct 2014 → Nov 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 231495-99 | Drill | Smith Producing Company | Mar 5, 1984 | Mar 5, 1984 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-28937 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,132 | 3,214 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 250 | 11 | 125 sx |
| 4.5 | 3,250 | 7.875 | 300 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 6, 1984 | Aug 20, 1984 | — |
| 00 | Sep 1, 1984 | Aug 20, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-33359 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-33359 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22733359, documented in the API reference.