WELL · 42-227-33485 · DISTRICT 8

Gulf-Myers #1

Plugged

Howard County · Knott West (Penn Reef) field  · Vertical

Gulf-Myers #1 (API 42-227-33485) is a plugged well in Howard County, plugged January 10, 1997, last operated by Stephens Autry C..

The RRC has issued 2 drilling permits between 1984 and 1996, permitted to 9,300 ft.

It was permitted by Langham Petroleum Expl. Corp. and has since transferred to Stephens Autry C. on the wellbore schedule.

Completion filings report 7 formation tops, including Surface Rock, Red Bed, Redbed, Redbed & Anhydrite.

Its 2 leases have reported 14.7K barrels of oil and 16.5K mcf of gas since January 1993, last reporting in April 1997. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Stephens Autry C.

Permitted by Langham Petroleum Expl. Corp.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Aug 11, 2000 · 475 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens Autry C.
Production reportsStephens, Autry C.through Jan 1997
Latest permitLangham Petroleum Expl. Corp.Feb 12, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
2
permits on file
Feb 12, 1996
last permit issued
Oct 10, 1984
completed
14.7K
cumulative oil, bbl
16.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 1984
Shut in
—
Plugged
Jan 10, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gulf-Myers O-10-34870Knott, West (Dean)Stephens, Autry C.1177187Mar 1996 – Apr 1997
Gulf-Myers O-10-29335Knott, West (Penn Reef)Stephens, Autry C.114.5K16.3KJan 1993 – Mar 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Langham Petroleum Expl. Corp.Jan 1993 → Apr 1996
  2. 2Stephens, Autry C.May 1996 → Jan 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444213-99RecompletionLangham Petroleum Expl. Corp.Jan 29, 1996Feb 12, 1996Feb 22, 19969,230
245707-99DrillGulf Oil Corp.Jul 19, 1984Jul 20, 1984—9,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-29335————
—— O-10-34870————

Formation tops

As filed on W-2/G-1. Subsea from 2,655 ft elevation.Download CSV →

FormationMD ftSubsea
Surface Rock2302,425
Red Bed3502,305
Redbed3502,305
Redbed & Anhydrite1,885770
Sand and Shale5,153-2,498
Sand and Lime6,150-3,495
Lime9,230-6,575

Perforations

Perforated and open-hole intervals.

FromToType
8,1808,220Perforated
9,0809,046Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.75350—275 S
8.6253,490—2,000 S
5.59,230—1,660 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 1996Mar 29, 1996Yes
00Apr 8, 1996Nov 2, 1984—
00Nov 12, 1984Nov 2, 1984—
00Nov 9, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22733485, documented in the API reference.