WELL · 42-227-34347 · DISTRICT 10

Hamlin, Juanita #1

Plugged

Howard County  · Vertical

Hamlin, Juanita #1 (API 42-227-34347) is a plugged well in Howard County, plugged July 8, 2005, last operated by Sharp Image Energy, Inc..

The RRC has issued 2 drilling permits between 1988 and 2003, permitted to 10,500 ft.

Operator of record

Sharp Image Energy, Inc.

Big Spring, TX · P-5 Y, filed May 4, 2026 · 665 permits on file · (432) 238-6478

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSharp Image Energy, Inc.Jul 17, 2003
10,500
total depth, ft
2
permits on file
Jul 17, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 8, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
534307-99ReenterSharp Image Energy, Inc.Jul 17, 2003Jul 17, 2003Jul 21, 20034,300
347550-99DrillChapman Exploration, Inc.Jun 9, 1988Jun 10, 1988Jun 10, 198810,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22734347, documented in the API reference.