WELL · 42-227-35057 · DISTRICT 8

Quinn 16 #1

Plugged

Howard County · Ernie Pinnell (Fusselman) field  · Vertical

Quinn 16 #1 (API 42-227-35057) is a plugged well in Howard County, plugged March 23, 2022, last operated by Morita Services LLC.

The RRC has issued one drilling permit, issued August 6, 1996, permitted to 10,500 ft.

It was permitted by Thompson, J. Cleo and has since transferred to Morita Services LLC on the wellbore schedule.

Completion filings report 6 formation tops, including San Andres, Spraberry, Wolfcamp, Strawn.

Its lease has reported 1.27K barrels of oil since October 1996, last reporting in April 2022.

Operator of record

Morita Services LLC

Permitted by Thompson, J. Cleo; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jun 4, 2026 · (918) 508-5165

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMorita Services LLC
Production reportsThompson, J. Cleothrough Nov 1998
Latest permitThompson, J. CleoAug 6, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
1
permits on file
Aug 6, 1996
last permit issued
Sep 25, 2006
completed
1.27K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Apr 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 25, 2006
Shut in
—
Plugged
Mar 23, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quinn 16 O-10-35087Ernie Pinnell (Fusselman)Morita Services, LLC11.27K0Oct 1996 – Apr 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thompson, J. CleoOct 1996 → Nov 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
451027-99DrillThompson, J. CleoAug 1, 1996Aug 6, 1996Aug 14, 199610,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35087————

Formation tops

As filed on W-2/G-1. Subsea from 2,474 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,160-686
SpraberrySPRAYBERRY6,320-3,846
Wolfcamp7,738-5,264
Strawn9,512-7,038
Woodford10,152-7,678
Devonian10,244-7,770

Perforations

Perforated and open-hole intervals.

FromToType
3,16010,400Perforated
10,37110,400Perforated
10,37110,481Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37517317.5175 S
9.6253,95612.251,210 S
5.510,3717.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 2007Nov 6, 2006—
00Apr 3, 2002Jun 22, 2001—
00Dec 4, 1996Oct 23, 1996Yes
00Nov 7, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.88M
bbl, all reported
Dec 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088338H-1 InjectionPlugged Mar 24, 202230,0003,50010,371–10,481

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 192,982(-100%)

050K100K20192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22735057, documented in the API reference.