WELL · 42-227-35435 · DISTRICT 10

McAllister '48' #2

Plugged

Howard County  · Vertical

Mcallister '48' #2 (API 42-227-35435) is a plugged well in Howard County, plugged July 16, 2007, last operated by Whiting Oil And Gas Corporation.

The RRC has issued 3 drilling permits between 2000 and 2007, permitted to 8,300 ft.

Operator of record

Whiting Oil and Gas Corporation

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,092 permits on file · (432) 934-7212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWhiting Oil and Gas CorporationJul 23, 2007
8,300
total depth, ft
3
permits on file
Jul 23, 2007
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 16, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
641865-99ReenterWhiting Oil and Gas CorporationJul 3, 2007Jul 23, 2007—5,700
600141-99ReenterThunderbolt Petroleum Co. LLCMay 3, 2005May 6, 2005—5,700
490836-99DrillSanta FE Snyder CorporationJan 5, 2000Jan 5, 2000Jan 21, 20008,300

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22735435, documented in the API reference.