WELL · 42-227-35674 · DISTRICT 8
Bond 21 #3
Howard County · Vertical
Bond 21 #3 (API 42-227-35674) is a plugged well in Howard County, plugged April 20, 2001, last operated by Lackey, William H. Oil And Gas.
The RRC has issued 2 drilling permits in 2001, permitted to 8,300 ft.
Completion filings report 4 formation tops, including Anhydrite, Yates, Seven Rivers, Wolfcamp.
Its lease has reported 52.3K barrels of oil and 390K mcf of gas since January 2002, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Lackey, William H. Oil and Gas
Shawnee, OK · P-5 Y, filed Nov 8, 2024 · 19 permits on file · (405) 275-4164
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Autumn Energy Operatingthrough Apr 2026 |
| Latest permit | Lackey, William H. Oil and GasNov 1, 2001 |
- 8,300
- total depth, ft
- 2
- permits on file
- Nov 1, 2001
- last permit issued
- —
- completed
- 52.3K
- cumulative oil, bbl
- 390K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 20, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bond 21 O-10-36792 | Signal Peak (Wolfcamp) | Autumn Energy Operating | 2 | 52.3K | 390K | Jan 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,935 · prior 12 6,831(+2%)
Oil, barrels lease total
Last 12 months 132 · prior 12 474(-72%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lackey, William H. Oil and GasJan 2002 → Feb 2024
- 2Autumn Energy OperatingMar 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 514911-99 | Reenter | Lackey, William H. Oil and Gas | Oct 31, 2001 | Nov 1, 2001 | Nov 6, 2001 | 8,300 |
| 506166-99 | Drill | Devon SFS Operating, Inc. | Mar 7, 2001 | Mar 13, 2001 | Mar 30, 2001 | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-36792 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,409 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anhydrite | 1,082 | 1,327 |
| Yates | 1,348 | 1,061 |
| Seven Rivers7 RIVERS | 1,430 | 979 |
| WolfcampTOP LOWER WOLFCAMP | 7,432 | -5,023 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,804 | 7,994 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,197 | 11 | 850 S |
| 5.5 | 8,197 | 7.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 2002 | Jan 17, 2002 | Yes |
| 00 | Feb 14, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35674 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35674 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735674, documented in the API reference.