WELL · 42-227-81901 · DISTRICT 10

Sterling Cattle Company #2

N

Howard County  · Vertical

Sterling Cattle Company #2 (API 42-227-81901) is a former disposal or injection well in Howard County, last operated by Bayswater Operating Company LLC; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1981 and 2025, permitted to 7,769 ft.

Operator of record

Bayswater Operating Company LLC

Denver, CO · P-5 Y, filed Jun 4, 2026 · 279 permits on file · (303) 893-2503

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBayswater Operating Company LLCMay 13, 2025
7,769
total depth, ft
2
permits on file
May 13, 2025
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
907869-99ReenterBayswater Operating Company LLCMay 8, 2025May 13, 2025—7,769
115598-99OtherMcFarland & Scobey, Inc.Apr 20, 1981Apr 20, 1981—2,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088729W-14 DisposalCanceled Oct 25, 19991,5001,0002,500–2,700

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22781901, documented in the API reference.