WELL · 42-231-30225 · DISTRICT 5
Baker-Thomas Unit #1
Hunt County · Wieland field · Producing · Vertical
Baker-Thomas Unit #1 (API 42-231-30225) is a well in Hunt County operated by Greenlight Enterprises LLC, completed January 9, 1986 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 17, 1985, permitted to 2,900 ft.
It was permitted by Talisman Energy Corporation and has since transferred to Greenlight Enterprises LLC on the wellbore schedule.
Completion filings report one formation top, including Woodbine.
Its lease has reported 5.05K barrels of oil and 18 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Talisman Energy Corporation; the EWA schedule now lists a different operator.
McKinney, TX · P-5 Y, filed Jul 4, 2026 · (760) 672-5287
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Greenlight Enterprises LLC |
| Production reports | Greenlight Enterprises LLCthrough Mar 2026 |
| Latest permit | Talisman Energy CorporationDec 17, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,900
- total depth, ft
- 1
- permits on file
- Dec 17, 1985
- last permit issued
- Jan 9, 1986
- completed
- 5.05K
- cumulative oil, bbl
- 18
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 9, 1986
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baker-Thomas Unit O-5-2968 | Wieland | Greenlight Enterprises LLC | 1 | 5.05K | 18 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 277 · prior 12 252(+10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Baxter, Kelly H.Jan 1993 → Oct 1993
- 2Bear of Texas, Inc.Jan 1994 → Apr 1996
- 3Case Production CompanyDec 2001 → Jul 2003
- 4Greenlight Enterprises LLCSep 2013 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 293074-99 | Drill | Talisman Energy Corporation | Dec 11, 1985 | Dec 17, 1985 | Dec 21, 1985 | 2,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2968 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 504 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Woodbine | 2,761 | -2,257 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,764 | 2,767 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 426 | 12.25 | 187 S |
| 5.5 | 2,906 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 1986 | Aug 21, 1986 | Yes |
| 00 | Oct 9, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-231-30225 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-231-30225 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23130225, documented in the API reference.