WELL · 42-233-31149 · DISTRICT 10

Burnett -RA- #20

N

Hutchinson County · Panhandle Hutchinson County Fld. field  · Vertical

Burnett -RA- #20 (API 42-233-31149) is a well in Hutchinson County operated by Red Line Company Ltd., completed October 13, 1981.

The RRC has issued one drilling permit, issued July 6, 1981, permitted to 3,350 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Red Line Company Ltd. on the wellbore schedule.

Its lease has reported 8.82K barrels of oil and 5.11K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Red Line Company Ltd.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Pampa, TX · P-5 Y, filed Nov 4, 2025 · 1 permits on file · (806) 669-8743

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRed Line Company Ltd.
Production reportsRed Line Company, Ltd.through Apr 2026
Latest permitHuber, J. M., CorporationJul 6, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,350
total depth, ft
1
permits on file
Jul 6, 1981
last permit issued
Oct 13, 1981
completed
8.82K
cumulative oil, bbl
5.11K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 13, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Burnett "RA" O-14-5258Panhandle Hutchinson County Fld.Red Line Company, Ltd.28.82K5.11KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 62 · prior 12 37(+68%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Huber, J. M., CorporationJan 1993 → Jul 1993
  2. 2Dyne Oil & Gas,inc.Sep 1993 → Mar 2002
  3. 3Pctb OperatingApr 2002 → Sep 2007
  4. 4TB Operating, LLCOct 2007 → May 2018
  5. 5Red Line Company, Ltd.Jun 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
123962-99DrillHuber, J. M., CorporationJul 6, 1981Jul 6, 1981Aug 30, 19813,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5258————

Perforations

Perforated and open-hole intervals.

FromToType
2,6843,202Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62547012.25185 S
2.3753,204——
23,204——
4.53,2347.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 16, 1982—
00Jan 12, 1984Dec 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23331149, documented in the API reference.