WELL · 42-233-31524 · DISTRICT 10
Wisdom #3-3
Hutchinson County · Panhandle West field · Temp Abandoned · Vertical
Wisdom #3-3 (API 42-233-31524) is a well in Hutchinson County operated by Blue Norther Oil & Gas LLC, completed January 31, 1983 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued November 19, 1982, permitted to 3,300 ft.
It was permitted by Pathfinder Petroleum Corporation and has since transferred to Blue Norther Oil & Gas LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Red Beds, Tubbs, Cimarron, Red Cave.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Pathfinder Petroleum Corporation; the EWA schedule now lists a different operator.
Red Oak, TX · P-5 Y, filed Mar 4, 2026 · (972) 816-9630
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Blue Norther Oil & Gas LLC |
| Production reports | Petro Haleythrough Aug 2005 |
| Latest permit | Pathfinder Petroleum CorporationNov 19, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,300
- total depth, ft
- 1
- permits on file
- Nov 19, 1982
- last permit issued
- Jan 31, 1983
- completed
- 0
- cumulative oil, bbl
- 67K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 31, 1983
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wisdom G-14-109116 | Panhandle, West | Blue Norther Oil & Gas, LLC | 1 | 0 | 67K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ramsey Property Management, Inc.Jan 1993 → Jan 1994
- 2Petro HaleyJan 1997 → Aug 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 178135-99 | Drill | Pathfinder Petroleum Corporation | Nov 19, 1982 | Nov 19, 1982 | — | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-109116 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,270 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Beds | 462 | 2,808 |
| Tubbs | 1,745 | 1,525 |
| Cimarron | 1,887 | 1,383 |
| Red Cave | 2,150 | 1,120 |
| Panhandle Lime | 2,485 | 785 |
| Brown Dolomite | 3,048 | 222 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,132 | 3,162 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 544 | 12.25 | 350 S |
| 5.5 | 3,192 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 1984 | Feb 2, 1984 | — |
| 00 | Mar 30, 1984 | Feb 2, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-31524 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-31524 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23331524, documented in the API reference.