WELL · 42-233-31525 · DISTRICT 10

Wisdom #11-1

Plugged

Hutchinson County · Panhandle E.(albany Dolmite LO) field  · Vertical

Wisdom #11-1 (API 42-233-31525) is a plugged well in Hutchinson County, plugged August 29, 1988, last operated by Ramsey Property Management Inc..

The RRC has issued one drilling permit, issued November 19, 1982, permitted to 3,300 ft.

It was permitted by Pathfinder Petroleum Corporation and has since transferred to Ramsey Property Management Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Red Beds, Tubbs, Cimarron, Red Cave.

Operator of record

Ramsey Property Management Inc.

Permitted by Pathfinder Petroleum Corporation; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed May 2, 1997 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRamsey Property Management Inc.
Production reportsnone
Latest permitPathfinder Petroleum CorporationNov 19, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
1
permits on file
Nov 19, 1982
last permit issued
Jan 8, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 1983
Shut in
—
Plugged
Aug 29, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
178139-99DrillPathfinder Petroleum CorporationNov 19, 1982Nov 19, 1982—3,300

Formation tops

As filed on W-2/G-1. Subsea from 3,105 ft elevation.Download CSV →

FormationMD ftSubsea
Red Beds4452,660
Tubbs1,5661,539
Cimarron1,7141,391
Red Cave1,9661,139
Panhandle2,309796
Brown Dolomite2,860245

Perforations

Perforated and open-hole intervals.

FromToType
2,9312,940Perforated
2,9462,952Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552612.25350 sx
5.53,1537.875150 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 1984Feb 29, 1984—
00May 1, 1984Feb 29, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23331525, documented in the API reference.