WELL · 42-233-31760 · DISTRICT 10
Wisdom B. #2
Hutchinson County · Panhandle West field · Vertical
Wisdom B. #2 (API 42-233-31760) is a plugged well in Hutchinson County, plugged March 2, 2022, last operated by Plumley Company.
The RRC has issued one drilling permit, issued September 22, 1983, permitted to 3,700 ft.
It was permitted by Gulf Oil Corp. and has since transferred to Plumley Company on the wellbore schedule.
Completion filings report 2 formation tops, including Wolf Camp, Lower Albany Dolomite.
Operator of record
Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.
Pampa, TX · P-5 Y, filed Apr 8, 2022 · (806) 274-2310
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Plumley Company |
| Production reports | Fort Worth Natural Gas, Inc.through Jul 2003 |
| Latest permit | Gulf Oil Corp.Sep 22, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Sep 22, 1983
- last permit issued
- Dec 12, 1985
- completed
- 0
- cumulative oil, bbl
- 813
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 12, 1985
- Shut in
- —
- Plugged
- Mar 2, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wisdom, B. G-14-111016 | Panhandle, West | Plumley Company | 1 | 0 | 813 | Jan 1993 – Mar 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Plumley CompanyFeb 2001 → Feb 2002
- 2Fort Worth Natural Gas, Inc.Sep 2002 → Jul 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 213996-99 | Drill | Gulf Oil Corp. | Aug 31, 1983 | Sep 22, 1983 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-111016 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,143 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wolf Camp | 2,730 | 413 |
| Lower Albany Dolomite | 2,840 | 303 |
| Lower Albany Dolomite | 2,967 | 176 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,840 | 3,302 | Perforated |
| 2,972 | 2,981 | Perforated |
| 2,998 | 3,002 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 608 | 12.25 | 350 S |
| 5.5 | 3,195 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 1986 | Jan 14, 1986 | — |
| 00 | Jul 26, 1984 | Jun 7, 1984 | — |
| 00 | Jun 30, 1984 | Jun 7, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-31760 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-31760 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23331760, documented in the API reference.