WELL · 42-233-31761 · DISTRICT 10

Meadows A #2

Plugged

Hutchinson County · Hutch (Granite Wash 6250) field  · Vertical

Meadows A #2 (API 42-233-31761) is a plugged well in Hutchinson County, plugged May 23, 2002, last operated by Phillips Petroleum Company.

The RRC has issued one drilling permit, issued September 21, 1983, permitted to 6,450 ft.

It was permitted by Benson-Mccown & Company and has since transferred to Phillips Petroleum Company on the wellbore schedule.

Completion filings report 4 formation tops, including Brown Dolomite, Council Grove, Granite Wash, Ellenburger.

Operator of record

Phillips Petroleum Company

Permitted by Benson-McCown & Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jun 20, 2003 · 2,544 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePhillips Petroleum Company
Production reportsnone
Latest permitBenson-McCown & CompanySep 21, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,450
total depth, ft
1
permits on file
Sep 21, 1983
last permit issued
Apr 19, 1993
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 1993
Shut in
—
Plugged
May 23, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Meadows "A" O-14-5581Hutch (Granite Wash 6250)Phillips Petroleum Company200Jan 1993 – Jul 2002

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
214058-99DrillBenson-McCown & CompanyMay 17, 1984Sep 21, 1983Sep 27, 19836,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5581————
—— O-14-5581————

Formation tops

As filed on W-2/G-1. Subsea from 2,998 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,090-92
Council Grove3,721-723
Granite Wash4,537-1,539
Granite WashLOWER GRANITE WASH6,184-3,186
Ellenburger6,420-3,422

Perforations

Perforated and open-hole intervals.

FromToType
4,5754,591Perforated
4,6344,653Perforated
5,9545,950Perforated
6,0106,015Perforated
6,0626,066Perforated
6,0896,100Perforated
6,1876,208Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51011600 sx
5.56,4497.875400 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 14, 1993Jun 11, 1993—
00Jun 23, 1993Jun 27, 1984—
00Jul 10, 1984Jun 27, 1984—
00Jan 31, 1984Jun 27, 1984—
00Jan 30, 1984Jun 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

7.45K
bbl, last 12 reported months
137K
bbl, all reported
Mar 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077741H-1 InjectionPlugged Jun 12, 20024505004,576–4,654

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 7,447 · prior 12 5,926(+26%)

05001K1.5K20012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23331761, documented in the API reference.