WELL · 42-233-31805 · DISTRICT 10
Johnson #1
Hutchinson County · Panhandle Hutchinson County Fld. field · Vertical
Johnson #1 (API 42-233-31805) is a plugged well in Hutchinson County, plugged May 31, 2019, last operated by Rio Petroleum Inc..
The RRC has issued 2 drilling permits between 1983 and 1992, permitted to 3,400 ft.
Completion filings report 6 formation tops, including Brown Dolomite, White Dolomite, Whitedolomite, Arkosic Dolomite.
Operator of record
Amarillo, TX · P-5 Y, filed Jul 4, 2026 · 128 permits on file · (806) 290-4855
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rio Petroleum Inc. |
| Production reports | Rio Petroleum, Inc.through Feb 2019 |
| Latest permit | Rio Petroleum, Inc.Mar 17, 1992 |
- 3,400
- total depth, ft
- 2
- permits on file
- Mar 17, 1992
- last permit issued
- Oct 1, 1984
- completed
- 0
- cumulative oil, bbl
- 292K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 1, 1984
- Shut in
- —
- Plugged
- May 31, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson -B- G-14-141185 | Panhandle, West | Rio Petroleum, Inc. | 1 | 0 | 292K | Jan 1993 – May 2019 |
| — O-14-6063 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rio Petroleum, Inc.Jan 1993 → Feb 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 394533-99 | Other | Rio Petroleum, Inc. | Nov 27, 1991 | Mar 17, 1992 | Oct 15, 1991 | 3,150 |
| 222924-99 | Drill | O-Tex Production | Nov 28, 1983 | Dec 8, 1983 | — | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-141185 | — | — | — | — |
| — | — O-14-6063 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,165 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,204 | 961 |
| White Dolomite | 2,380 | 785 |
| Whitedolomite | 2,380 | 785 |
| Arkosic Dolomite | 2,710 | 455 |
| Arkosicdolomite | 2,710 | 455 |
| Granite Wash | 2,830 | 335 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,330 | 2,646 | Perforated |
| 2,742 | 2,870 | Perforated |
| 2,742 | 3,104 | Perforated |
| 3,028 | 3,104 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 604 | 12.25 | 225 S |
| 5.5 | 3,400 | 7.875 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 13, 1992 | Jan 2, 1992 | — |
| 00 | May 1, 1992 | — | — |
| 00 | Apr 25, 1985 | Nov 13, 1984 | — |
| 00 | Apr 24, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-31805 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-31805 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23331805, documented in the API reference.