WELL · 42-233-31836 · DISTRICT 10

Watters -C- #4

Plugged

Hutchinson County · Panhandle West field  · Vertical

Watters -C- #4 (API 42-233-31836) is a plugged well in Hutchinson County, plugged July 1, 1992, last operated by D. J. Production Inc..

The RRC has issued one drilling permit, issued January 27, 1984, permitted to 3,500 ft.

It was permitted by Wheeler Oil CO. (A) and has since transferred to D. J. Production Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Panhandle Lime, Wolfcamp, Gulf Oil Pay.

Operator of record

D. J. Production Inc.

Permitted by Wheeler Oil Co. (A); the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Mar 1, 2002 · 20 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD. J. Production Inc.
Production reportsnone
Latest permitWheeler Oil Co. (A)Jan 27, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Jan 27, 1984
last permit issued
May 11, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 11, 1984
Shut in
—
Plugged
Jul 1, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-14-111118——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
227640-99DrillWheeler Oil Co. (A)Jan 24, 1984Jan 27, 1984—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-111118————

Formation tops

As filed on W-2/G-1. Subsea from 3,316 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime2,506810
Wolfcamp3,097219
Gulf Oil Pay3,168148

Perforations

Perforated and open-hole intervals.

FromToType
3,1033,206Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,28112.25500 sx
4.53,4087.875150 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 1984Jun 11, 1984—
00Jul 31, 1984Jun 11, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23331836, documented in the API reference.