WELL · 42-233-32511 · DISTRICT 10
West Turkey Track #20
Hutchinson County · Arrington (Morrow) field · Vertical
West Turkey Track #20 (API 42-233-32511) is a plugged well in Hutchinson County, plugged September 12, 2011, last operated by Linn Operating Inc..
The RRC has issued one drilling permit, issued March 30, 1993, permitted to 7,000 ft.
It was permitted by Arrington Cjm, Inc. and has since transferred to Linn Operating Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Brown Dolomite, Lkc, Granite Wash, 13 Finger Lime.
Operator of record
Permitted by Arrington CJM, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 8, 2019 · 1,401 permits on file · (281) 840-4000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Linn Operating Inc. |
| Production reports | Latigo Petroleum, Inc.through Apr 2011 |
| Latest permit | Arrington CJM, Inc.Mar 30, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Mar 30, 1993
- last permit issued
- Jun 11, 1993
- completed
- 0
- cumulative oil, bbl
- 627K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1993 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 11, 1993
- Shut in
- —
- Plugged
- Sep 12, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Turkey Track G-14-146301 | Arrington (Morrow) | Linn Operating, Inc. | 1 | 0 | 627K | Jun 1993 – Oct 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arrington CJM, Inc.Jun 1993 → Jul 2005
- 2Latigo Petroleum Texas, LPAug 2005 → Dec 2008
- 3Latigo Petroleum, Inc.May 2009 → Apr 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409479-99 | Drill | Arrington CJM, Inc. | Mar 2, 1993 | Mar 30, 1993 | Apr 13, 1993 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-146301 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,893 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,946 | -53 |
| LKC | 5,157 | -2,264 |
| Granite Wash | 5,450 | -2,557 |
| 13 Finger Lime | 6,345 | -3,452 |
| Morrow | 6,400 | -3,507 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,402 | 6,406 | Perforated |
| 6,422 | 6,428 | Perforated |
| 6,455 | 6,458 | Perforated |
| 6,475 | 6,488 | Perforated |
| 6,541 | 6,548 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,952 | 12.25 | 1,160 S |
| 4.5 | 6,755 | 7.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 1993 | Jul 14, 1993 | Yes |
| 00 | Sep 7, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-32511 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-32511 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23332511, documented in the API reference.